Jamis DAKAR SPORT 1997 VS Merlin CRITICAL PATH 1998 specs comparison

Jamis Dakar Sport 1997 comparison online with competitors

Jamis Dakar Sport

General Infos
Model Dakar Sport
Manufacturer Jamis
Year of production 1997
Current price Check price Here ==>   
Color choice - green
-Charcoal
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
- 21 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
- 21 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano Deore LX Levers
Shimano Deore LX V-Brake Brakes
Hubs for disc brakesShimano STX-RC
Rims manufacturer 32-hole
Sun Rims CR18
Spoke nipples typeBrass Nipples
Spoke wheel 2.0 (millimeters) Straight Gauge
Chung Nan Stainless Steel

Frame and Body Specs

Frame materials Double-butted
7005 Aluminum
Frame typeTIG-welded
Handlebar constructionTitec Enduro Hell Bent
Handlebar extenderTitec L-Bend
Handlebar stem detailsKalloy Uno
Headset size1 1/8 (inches) Threadless Dia-Compe Kontak Aheadset ST-2

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG51
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 110 (millimeters) Spindle
Shimano BB-UN52
Crankset parts and sizes 22/32/42 Teeth
Shimano STX-RC
Gear shift leversShimano STX-RC RapidFire SL
Rear gear set 11 - 28 Teeth
8-speed

Jamis Dakar Sport Fork System Data

Derailleur (Front) Top-pull and clamp-on 31.8 (millimeters)
Shimano STX-RC Top-swing
Derailleur (Rear)Shimano STX-RC
Fork material Triple-clamp Crown
Magnesium
Fork typeRock Shox Indy XC

Other Specs of Jamis Dakar Sport

Component group setsShimano STX-RC
Pedals detailsWellgo WPD-700
Rear shock absorber 3.0 (inches) Travel
Cane Creek AD-4
Saddle seatViscount 2973
Seat post extension 27.2 (millimeters) Diameter
Titec PG


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....