Jamis DAKAR XC 2007 VS Merlin CRITICAL PATH 1998 specs comparison
Jamis Dakar XC
General InfosModel | Dakar XC |
Manufacturer | Jamis |
Year of production | 2007 |
Current price | Check price Here ==> |
Color choice |
- Titanium and Black -Le Mans Blue and Black |
Sizes |
- 13GÇ¥ - 15GÇ¥ - 17GÇ¥ - 19GÇ¥ - 21GÇ¥ |
Sizes |
- 13GÇ¥ - 15GÇ¥ - 17GÇ¥ - 19GÇ¥ - 21GÇ¥ |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) Maxxis Mobster |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Tektro Levers Shimano M415 Disc Brakes |
Hubs for disc brakes | Shimano Centerlock Disc |
Rims manufacturer | 32-hole WTB SpeedDisc |
Spoke nipples type | Not Available |
Spoke wheel | 14ga. Straight Gauge WTB Stainless Steel |
Frame and Body Specs
Frame materials | 7005 Aluminum c |
Frame type | TIG-welded |
Handlebar construction | Easton EA30 |
Handlebar extender | Optional |
Handlebar stem details | Easton EA30 |
Headset size | 1 1/8 (inches) Threadless Aheadset STS-2K |
Gearing Specifications
Bicycle chain | KMC HG-40 |
Bottom bracket shell width | 68 (millimeters) |
Bottom bracket type | 113 (millimeters) Spindle Shimano ES25 |
Crankset parts and sizes | 22/32/42 Teeth Shimano M341 |
Gear shift levers | Shimano Alivio |
Rear gear set | 11 - 32 Teeth 8-speed |
Jamis Dakar XC Fork System Data
Derailleur (Front) | 31.8 (millimeters) Clamp Shimano Alivio |
Derailleur (Rear) | Shimano Deore |
Fork material | Single Crown Aluminum and magnesium |
Fork type | 100 (millimeters) Manitou Slate Comp |
Other Specs of Jamis Dakar XC
Component group sets | Mountain Mix |
Pedals details | ATB Platform |
Rear shock absorber | 90 (millimeters) Fox Vanilla |
Saddle seat | WTB Speed V Sport SE |
Seat post extension | 27.2 (millimeters) Diameter Easton EA30 |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Jamis provided us with the latest version of its Dakar XC bike manual
- Find All parts, tires and accessories of Jamis Dakar XC Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here