K2 ATTACK 3.0 2002 VS Merlin CRITICAL PATH 1998 specs comparison

K2 Attack 3.0 2002 comparison online with competitors

K2 Attack 3.0

General Infos
Model Attack 3.0
Manufacturer K2
Year of production 2002
Current price Check price Here ==>   
Color choice -Red and Silver
Sizes - Large
- medium
- small
- way big
Sizes - Large
- medium
- small
- way big

Wheels And Breaking System

Bike front tire Rear: 26 X 2.00 (inches) WTB NanoRaptor DNA
Front: 26 X 2.10 (inches) WTB NanoRaptor DNA
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Tektro 379A Levers
Tektro 829A Brakes
Hubs for disc brakesWTB Speed C2
Rims manufacturer 32-hole
WTB SpeedMaster
Spoke nipples typeBrass Nipples
Spoke wheel 15ga. Straight Gauge
WTB Stainless Steel

Frame and Body Specs

Frame materials7005 aluminum c
Frame typeTIG-welded
Handlebar construction 1.25 (inches) Rise
Aluminum
Handlebar extenderOptional
Handlebar stem detailsAluminum Threadless
Headset size1 1/8 (inches) Threadless WTB Momentum Comp ST

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
KMC Z9000
Bottom bracket shell width68 (millimeters) English
Bottom bracket typeSealed Cartridge
Crankset parts and sizes 22/32/42 Teeth
TruVativ Firex XR
Gear shift leversShimano Deore RapidFire SL
Rear gear set 11 - 32 Teeth
9-speed

K2 Attack 3.0 Fork System Data

Derailleur (Front) Clamp-on
Shimano LX
Derailleur (Rear)Shimano Deore
Fork material Single Triple-clamp Crown
Aluminum
Fork type 4.0'' Travel
Rock Shox Judy XC

Other Specs of K2 Attack 3.0

Component group setsMountain Mix
Pedals details Aluminum Cage With Clips & Straps
Resin Body
Rear shock absorber 3.5 (inches) Travel
Noleen Sport Adjustable
Saddle seatWTB SST.X3
Seat post extension 31.8 (millimeters) Diameter
Aluminum Micro-adjust


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....