KHS AM2000 2007 VS Merlin CRITICAL PATH 1998 specs comparison

KHS AM2000 2007 comparison online with competitors

KHS AM2000

General Infos
Model AM2000
Manufacturer KHS
Year of production 2007
Current price Check price Here ==>   
Color choice -Primer Red
Sizes - Small
- medium
- large
Sizes - Small
- medium
- large

Wheels And Breaking System

Bike front tire26 X 2.40 (inches) WTB MutanoRaptor
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes HFX-9 Levers
Hayes HFX-9 With 7 (inches) Rotor Brakes
Hubs for disc brakes Rear: Formula Sealed
Front: Formula Disc With 20 (millimeters) Axle
Rims manufacturer 32-hole
SUN Single Track
Spoke nipples typeNot Available
Spoke wheel 14ga.
Stainless Steel

Frame and Body Specs

Frame materials7005 aluminum c
Frame typeTIG-welded
Handlebar constructionTruvativ XR Riser
Handlebar extenderOptional
Handlebar stem detailsTruVativ Hussefelt
Headset size1 1/8 (inches) Threadless FSA PIG

Gearing Specifications

Bicycle chainKMC Z9000
Bottom bracket shell widthNot Available
Bottom bracket typeTruVativ Howitzer
Crankset parts and sizes 22/32/44 Teeth
TruVativ Hussefelt
Gear shift leversShimano XT
Rear gear set 11 - 34 Teeth
9-speed

KHS AM2000 Fork System Data

Derailleur (Front)Shimano Deore
Derailleur (Rear)Shimano XT
Fork material Single Crown
Aluminum and magnesium
Fork type 140 (millimeters) Travel
RockShox Pike 426

Other Specs of KHS AM2000

Component group setsShimano XT
Pedals detailsTenderizer Alloy Platform
Rear shock absorber 6 (inches) Travel
RockShox MC 3.3
Saddle seatWTB Pure V Race
Seat post extensionTruvativ XR Double Clamp


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....