KHS DH200 2008 VS Merlin CRITICAL PATH 1998 specs comparison

KHS DH200 2008 comparison online with competitors

KHS DH200

General Infos
Model DH200
Manufacturer KHS
Year of production 2008
Current price Check price Here ==>   
Color choice -Flat Black
Sizes - Small
- medium
Sizes - Small
- medium

Wheels And Breaking System

Bike front tire Rear: 26 X 2.35 (inches) Kenda Nevegal
Front: 26 X 2.50 (inches) Kenda Nevegal
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes Stroker Trail Hydraulic Levers
Hayes Stroker Trail With V8 Rotor Brakes
Hubs for disc brakes Rear: Formula Disc
Front: Formula Disc With 20 (millimeters) Axle
Rims manufacturer 32-hole
SUN Single Track
Spoke nipples typeNot Available
Spoke wheel 14ga.
Stainless Steel

Frame and Body Specs

Frame materials6061 aluminum c
Frame typeTIG-welded
Handlebar constructionWTB TXC Riser
Handlebar extenderOptional
Handlebar stem detailsTruVativ Holzfeller DH
Headset size1 1/8 (inches) Threadless Cane Creek Integrated

Gearing Specifications

Bicycle chainKMC Z9000
Bottom bracket shell widthNot Available
Bottom bracket typeTruVativ Howitzer
Crankset parts and sizes 40 Teeth
TruVativ Holzfeller OCT
Gear shift leversSRAM Attack Trigger
Rear gear set 11 - 26 Teeth
9-speed

KHS DH200 Fork System Data

Derailleur (Front)Not Available
Derailleur (Rear)Shimano Saint
Fork material Dual Crown
Aluminum and magnesium
Fork type 203 (millimeters) Travel
Fox 40R

Other Specs of KHS DH200

Component group setsDownhill Mix
Pedals detailsAlloy Platform
Rear shock absorber 8 (inches) Travel
Fox DHX 5.0
Saddle seatWTB Rocket V Comp
Seat post extensionTruvativ XR


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....