KHS XC 204 XL 2011 VS Merlin CRITICAL PATH 1998 specs comparison
KHS XC 204 XL
General InfosModel | XC 204 XL |
Manufacturer | KHS |
Year of production | 2011 |
Current price | Check price Here ==> |
Color choice |
-Black and White |
Sizes |
- Xlarge |
Sizes |
- Xlarge |
Wheels And Breaking System
Bike front tire | 26 X 2.1 (inches) John Tomac Nevegal |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Bengal Helix 3.0 Levers Bengal Helix 3.0 Brakes |
Hubs for disc brakes | Alloy |
Rims manufacturer | WTB SX24 |
Spoke nipples type | Not Available |
Spoke wheel | 14ga. |
Frame and Body Specs
Frame materials | Alloy |
Frame type | TIG-welded |
Handlebar construction | Kore Riser |
Handlebar extender | Optional |
Handlebar stem details | Kore Riser |
Headset size | Threadless Cane Creek ZST2 |
Gearing Specifications
Bicycle chain | KMC Z99 |
Bottom bracket shell width | Not Available |
Bottom bracket type | Outboard Cartridge |
Crankset parts and sizes | 22/32/44 Teeth KHS Forged 2 Pc |
Gear shift levers | Shimano Alivio Rapid Fire |
Rear gear set | 11 - 34 Teeth 9-speed |
KHS XC 204 XL Fork System Data
Derailleur (Front) | Shimano Alivio |
Derailleur (Rear) | Shimano Deore Shadow |
Fork material | Single Crown Alloy |
Fork type | 120 (millimeters) Travel RST Titan Air |
Other Specs of KHS XC 204 XL
Component group sets | Shimano Mix |
Pedals details | Wellgo Alloy ATB |
Rear shock absorber | 120 (millimeters) Travel RockShox Bar 2.1 Air |
Saddle seat | WTB Speed V Sport |
Seat post extension | Alloy Micro Adjust |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, KHS provided us with the latest version of its XC 204 XL bike manual
- Find All parts, tires and accessories of KHS XC 204 XL Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here