KHS XC-604 2006 VS Merlin CRITICAL PATH 1998 specs comparison

KHS XC-604 2006 comparison online with competitors

KHS XC-604

General Infos
Model XC-604
Manufacturer KHS
Year of production 2006
Current price Check price Here ==>   
Color choice -Flat black and matt black
Sizes - Small
- medium
- large
Sizes - Small
- medium
- large

Wheels And Breaking System

Bike front tire Kevlar Bead
26 X 2.10 (inches) John Tomac Nevegal 120TPI
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes Sole 2-finger Levers
Ø 6 (inches) Rotors Brakes
Hayes Sole
Hubs for disc brakes Rear: Shimano M475 Rear Disc
Front: Formula Disc
Rims manufacturer 32-hole
Sun CR18 Doublewall
Spoke nipples typeBrass Nipples
Spoke wheel 14ga. Straight Gauge
Black

Frame and Body Specs

Frame materials6061 aluminum c
Frame typeTIG-welded
Handlebar constructionTruvativ LE Riserbar Ø31.8
Handlebar extenderNot Available
Handlebar stem detailsTruvativ XR 3D Ø31.8
Headset size1 1/8 (inches) Threadless WTB-ST

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
KMC Z9000
Bottom bracket shell width68 (millimeters) English
Bottom bracket typeTruvativ Power Spline
Crankset parts and sizes 44/32/22 Teeth
Truvativ FiveD
Gear shift leversSram X.7
Rear gear set 11 - 34 Teeth
9-speed

KHS XC-604 Fork System Data

Derailleur (Front)Shimano Deore FD-M530L6L
Derailleur (Rear)Sram X.9
Fork materialNot Available
Fork type 100 (millimeters)
RockShox Tora 318 Solo Air

Other Specs of KHS XC-604

Component group setsSRAM X.9/mix
Pedals detailsVP-M31 Clipless
Rear shock absorber 89 (millimeters) Travel
RockShox MC3.1
Saddle seatWTB Pure V Comp
Seat post extensionTruvativ XR Double Clamp


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....