KHS XC004 2008 VS Merlin CRITICAL PATH 1998 specs comparison

KHS XC004 2008 comparison online with competitors

KHS XC004

General Infos
Model XC004
Manufacturer KHS
Year of production 2008
Current price Check price Here ==>   
Color choice -Dark Blue
Sizes - Small
- Medium
- Large
- Extra large
Sizes - Small
- Medium
- Large
- Extra large

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) KHS
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Alloy Linear Levers
Bengal Cable Disc Brakes
Hubs for disc brakesAlloy Disc QR
Rims manufacturer 36-hole
Weinmann Taurus 2000
Spoke nipples typeNot Available
Spoke wheel 14ga.
Black

Frame and Body Specs

Frame materials6061 aluminum c
Frame typeTIG-welded
Handlebar constructionAlloy Riser
Handlebar extenderOptional
Handlebar stem detailsAlloy
Headset sizeCane Creek A-head Zero Stack

Gearing Specifications

Bicycle chainKMC Z51
Bottom bracket shell widthNot Available
Bottom bracket typeTruVativ Power Spline
Crankset parts and sizes 24/34/42 Teeth
TruVativ X-Flow
Gear shift leversShimano Alivio
Rear gear set 11 - 32 Teeth
8-speed

KHS XC004 Fork System Data

Derailleur (Front)Shimano C-050
Derailleur (Rear)Shimano Alivio M410
Fork material Single Crown
Aluminum and magnesium
Fork type 100 (millimeters) Travel
Spinner Point 286

Other Specs of KHS XC004

Component group setsMountain Mix
Pedals detailsWellgo
Rear shock absorberTough Shock FDR
Saddle seatKHS Sport Dual Density
Seat post extensionAlloy Micro Adjust


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....