Koga Miyata X-CONTROL ALLOY 2004 VS Merlin CRITICAL PATH 1998 specs comparison
Koga Miyata X-Control Alloy
General InfosModel | X-Control Alloy |
Manufacturer | Koga Miyata |
Year of production | 2004 |
Current price | Check price Here ==> |
Color choice |
-Black Matte |
Sizes |
- 41cm (centimeters) - 46cm (centimeters) - 50cm (centimeters) - 54cm (centimeters) |
Sizes |
- 41cm (centimeters) - 46cm (centimeters) - 50cm (centimeters) - 54cm (centimeters) |
Wheels And Breaking System
Bike front tire | 26 X 1.95 (inches) Schwalbe Racing Ralph Evolution |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano Deore M555 Hydraulic Levers Shimano Deore M555 Hydraulic Disc Brakes |
Hubs for disc brakes | Mavic Crossland |
Rims manufacturer | Mavic Crossland |
Spoke nipples type | Not Available |
Spoke wheel | Mavic |
Frame and Body Specs
Frame materials | 7005 aluminum c |
Frame type | TIG-welded |
Handlebar construction | Ritchey Comp 31.8 |
Handlebar extender | Ritchey WCS |
Handlebar stem details | Ritchey Pro 31.8 |
Headset size | 1 1/8 (inches) Integrated Cane Creek ZS-2 |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-HG73 |
Bottom bracket shell width | Not Available |
Bottom bracket type | Shimano BB-ES51 |
Crankset parts and sizes | 22/32/44 Teeth Shimano Deore LX |
Gear shift levers | Shimano Deore LX RapidFire |
Rear gear set | 11 - 32 Teeth 9-speed |
Koga Miyata X-Control Alloy Fork System Data
Derailleur (Front) | Shimano Deore LX |
Derailleur (Rear) | Shimano Deore LX SGS |
Fork material | Single Crown Aluminum and magnesium |
Fork type | 70-115 (millimeters) Adjustable Travel Rock Shox Judy SL |
Other Specs of Koga Miyata X-Control Alloy
Component group sets | Shimano Deore LX |
Pedals details | Time ATAC Alium S |
Rear shock absorber | Air Shock |
Saddle seat | Selle San Marco ODS |
Seat post extension | 31.4 (millimeters) Diameter Ritchey Pro |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Koga Miyata provided us with the latest version of its X-Control Alloy bike manual
- Find All parts, tires and accessories of Koga Miyata X-Control Alloy Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here