Kona BEAR DEE-LUX 2002 VS Merlin CRITICAL PATH 1998 specs comparison

Kona Bear Dee-Lux 2002 comparison online with competitors

Kona Bear Dee-Lux

General Infos
Model Bear Dee-Lux
Manufacturer Kona
Year of production 2002
Current price Check price Here ==>   
Color choice -Grey and Polish
Sizes - 15 (inches)
- 17 (inches)
- 18 (inches)
- 19 (inches)
- 20 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 18 (inches)
- 19 (inches)
- 20 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) Tioga Factory XC Extreme
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes Hydraulic Disc Levers
Hayes HFX Magnesium Hydraulic Brakes
Hubs for disc brakesShimano Deore Disc
Rims manufacturerMavic 317D
Spoke nipples typeNot Available
Spoke wheel 15ga. Front and 14ga. Rear Straight Gauge
Stainless Steel

Frame and Body Specs

Frame materials Double-butted
7005 Aluminum
Frame typeTIG-welded
Handlebar constructionKona DH Aluminum Riser
Handlebar extenderOptional
Handlebar stem detailsRace Face Prodigy
Headset size1 1/8 (inches) Threadless Aheadset STS

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG73
Bottom bracket shell widthNot Available
Bottom bracket typeTien Hsin BB-9900 ISIS
Crankset parts and sizes 22/32/44 Teeth
Race Face Turbine Enduro ISIS
Gear shift leversShimano Deore XT RapidFire SL
Rear gear set 11 - 32 Teeth
9-speed

Kona Bear Dee-Lux Fork System Data

Derailleur (Front)Shimano Deore XT
Derailleur (Rear)Shimano Deore XT
Fork material Single Triple-clamp Crown
Aluminum
Fork type 4.0 (inches) Travel
Fox F100RL

Other Specs of Kona Bear Dee-Lux

Component group setsMountain Mix
Pedals detailsShimano PD-M536 SPD
Rear shock absorberFox Float RL
Saddle seatSDG Grand Prix
Seat post extensionIRD Quad 2


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....