Kona COILER DEE-LUX 2005 VS Merlin CRITICAL PATH 1998 specs comparison

Kona Coiler Dee-Lux 2005 comparison online with competitors

Kona Coiler Dee-Lux

General Infos
Model Coiler Dee-Lux
Manufacturer Kona
Year of production 2005
Current price Check price Here ==>   
Color choice -Matte Silver and Black
Sizes - 15 (inches)
- 17 (inches)
- 18 (inches)
- 19 (inches)
- 22 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 18 (inches)
- 19 (inches)
- 22 (inches)

Wheels And Breaking System

Bike front tire26 X 2.30 (inches) Nokian NBX
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes HFX Magnesium Hydraulic Levers
Hayes HFX Magnesium Hydraulic Front and Hayes HFX Magnesium Hydraulic Disc Rear Brakes
Hubs for disc brakes Rear: Shimano FH-M525
Front: KK Disc
Rims manufacturer 32-hole
Sun Rims Single Track
Spoke nipples typeBrass Nipples
Spoke wheel 14ga. Straight Gauge
Stainless Steel

Frame and Body Specs

Frame materials7005 aluminum c
Frame typeTIG-welded
Handlebar constructionRaceFace Evolve DH Riser
Handlebar extenderNot Available
Handlebar stem detailsRace Face Evolve
Headset size1 1/8 (inches) Threadless FSA The Pig

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG73
Bottom bracket shell widthNot Available
Bottom bracket typeRace Face Evolve DH
Crankset parts and sizes 22/32/44 Teeth
RaceFace Evolve DH
Gear shift leversShimano Deore LX RapidFire
Rear gear set 11 - 32 Teeth
9-speed

Kona Coiler Dee-Lux Fork System Data

Derailleur (Front) Top-pull
Shimano Deore LX
Derailleur (Rear)Shimano Deore XT SGS
Fork material Single Crown
Aluminum
Fork type 150 (millimeters) Travel
Marzocchi 66 XF

Other Specs of Kona Coiler Dee-Lux

Component group setsMountain Mix
Pedals detailsShimano PD-M520 SPD
Rear shock absorberFox DHX
Saddle seatWTB Laser V Race
Seat post extensionRace Face Atlas AM


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....