Kona DAWG 2004 VS Merlin CRITICAL PATH 1998 specs comparison

Kona Dawg 2004 comparison online with competitors

Kona Dawg

General Infos
Model Dawg
Manufacturer Kona
Year of production 2004
Current price Check price Here ==>   
Color choice -Black and Silver
Sizes - 15 (inches)
- 17 (inches)
- 18 (inches)
- 19 (inches)
- 20 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 18 (inches)
- 19 (inches)
- 20 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) Tioga Factory XC Extreme
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes HFX-9 Hydraulic Disc Levers
Hayes HFX-9 Hydraulic Disc Brakes
Hubs for disc brakes Rear: Shimano FH-M475 Disc
Front: Shimano HB-M475 Disc
Rims manufacturer 32-hole
Mavic XM 117 Disc
Spoke nipples typeBrass Nipples
Spoke wheel 15ga. Front and 14ga. Rear Straight Gauge
Stainless Steel

Frame and Body Specs

Frame materials7005 aluminum c
Frame typeTIG-welded
Handlebar constructionKona Aluminum Riser
Handlebar extenderOptional
Handlebar stem detailsKoski Strong Hold Deluxe
Headset size1 1/8 (inches) Threadless Aheadset STS

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG53
Bottom bracket shell widthNot Available
Bottom bracket typeRace Face ISIS SRX
Crankset parts and sizes 24/32/44 Teeth
Race Face Ride XC ISIS
Gear shift leversShimano Deore RapidFire
Rear gear set 11 - 32 Teeth
9-speed

Kona Dawg Fork System Data

Derailleur (Front) Top-pull and clamp-on
Shimano Deore
Derailleur (Rear)Shimano Deore LX SGS
Fork material Single Crown
Aluminum and magnesium
Fork type 100 (millimeters) Travel
Marzocchi EXR Pro

Other Specs of Kona Dawg

Component group setsMountain Mix
Pedals detailsShimano PD-M505 SPD
Rear shock absorber 4.0 (inches) Travel
Fox Float R
Saddle seatSDG-Kona Grand Prix
Seat post extensionKoski Stronghold


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....