Kona STAB PRIMO 2001 VS Merlin CRITICAL PATH 1998 specs comparison

Kona Stab Primo 2001 comparison online with competitors

Kona Stab Primo

General Infos
Model Stab Primo
Manufacturer Kona
Year of production 2001
Current price Check price Here ==>   
Color choice -Ball Burnished and Polished
Sizes - Large
- medium
- small
Sizes - Large
- medium
- small

Wheels And Breaking System

Bike front tire26 X 2.60 (inches) Nokian Gazzalodi
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes Hydraulic Disc Levers
Hayes Hydraulic Disc Brakes
Hubs for disc brakes Rear: Ringle 12 (millimeters) DH
Front: Ringle 20 (millimeters) DH
Rims manufacturerMavic D321 Disc
Spoke nipples typeNot Available
Spoke wheelDT Stainless Steel

Frame and Body Specs

Frame materialsKona DH 7005 Aluminum
Frame typeTIG-welded
Handlebar constructionKona DH Primo Aluminum Riser
Handlebar extenderOptional
Handlebar stem detailsFunn Serial Rippa
Headset sizeAheadset SX-1

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG92
Bottom bracket shell widthNot Available
Bottom bracket typeKona OBMX Cromo Splined
Crankset parts and sizes 46 Teeth
Kona Bulge Cromoly
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 28 Teeth
9-speed

Kona Stab Primo Fork System Data

Derailleur (Front) Chain Retention Device
Mr. Dirt Gizmo
Derailleur (Rear)Shimano XTR
Fork material Double Triple-clamp Crown
Aluminum
Fork type 7.0 (inches) Travel
Marzocchi Shiver DH

Other Specs of Kona Stab Primo

Component group setsDownhill Mix
Pedals detailsShimano PD-M646 SPD
Rear shock absorber 9.0 (inches) Travel
Fox DH
Saddle seatSDG Big Boy DH
Seat post extensionTitec Knock DH


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....