Kona STINKY PRIMO 2001 VS Merlin CRITICAL PATH 1998 specs comparison

Kona Stinky Primo 2001 comparison online with competitors

Kona Stinky Primo

General Infos
Model Stinky Primo
Manufacturer Kona
Year of production 2001
Current price Check price Here ==>   
Color choice -Flat Balck and Polish
Sizes - 15 (inches)
- 17 (inches)
- 18 (inches)
- 19 (inches)
- 20 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 18 (inches)
- 19 (inches)
- 20 (inches)

Wheels And Breaking System

Bike front tire26 X 2.30 (inches) Tioga Factory DH
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes XC Hydraulic Levers
Hayes XC Hydraulic Brakes
Hubs for disc brakes Rear: Shimano Deore XT Disc
Front: King Kong QR 20 Disc
Rims manufacturer Rear: Mavic T519
Front: Mavic F519
Spoke nipples typeNot Available
Spoke wheel 14g
Stainless Steel

Frame and Body Specs

Frame materialsKona Clump 7005 Aluminum
Frame typeTIG-welded
Handlebar constructionKona DH Primo Aluminum Riser
Handlebar extenderOptional
Handlebar stem detailsFunn Serial Rippa
Headset sizeAheadset SX-1

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG72
Bottom bracket shell widthNot Available
Bottom bracket typeTruVativ Hollow Splined
Crankset parts and sizes 22/32/44 Teeth
Race Face North Shore
Gear shift leversShimano Deore XT RapidFire SL
Rear gear set 11 - 32 Teeth
9-speed

Kona Stinky Primo Fork System Data

Derailleur (Front)Shimano Deore LX
Derailleur (Rear)Shimano XTR
Fork material Triple-clamp Crown
Aluminum
Fork type 5.1 (inches) Travel
Marzocchi Z1 MCR

Other Specs of Kona Stinky Primo

Component group setsMountain Mix
Pedals detailsShimano PD-M545 SPD
Rear shock absorberFox Vanilla RC
Saddle seatSDG Grand Prix Kevlar
Seat post extensionIRD Quad 2


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....