Kona STINKY TL 2011 VS Merlin CRITICAL PATH 1998 specs comparison

Kona STINKY TL
General InfosModel | STINKY TL |
Manufacturer | Kona |
Year of production | 2011 |
Current price | Check price Here ==> |
Color choice | -Pearl white |
Sizes | - 15 (inches)- 17 (inches)- 18 (inches)- 19 (inches)- 20 (inches) |
Sizes | - 15 (inches)- 17 (inches)- 18 (inches)- 19 (inches)- 20 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.5 (inches) Maxxis Minion |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid Elixir 5 LeversAvid Elixir 5 Brakes |
Hubs for disc brakes | Formula Disc |
Rims manufacturer | Sun Estate |
Spoke nipples type | Not Available |
Spoke wheel | 14ga. Sandvik Stainless |
Frame and Body Specs
Frame materials | Kona Clump 7005 Aluminum |
Frame type | Aluminum |
Handlebar construction | Kona DH |
Handlebar extender | Optional |
Handlebar stem details | Kona DH |
Headset size | 1.5 (inches) FSA Orbit Zero Stack Tapered |
Gearing Specifications
Bicycle chain | SRAM 951 PowerChain |
Bottom bracket shell width | Not Available |
Bottom bracket type | FSA |
Crankset parts and sizes | 36/24/E*13 TeethFSA Moto FR |
Gear shift levers | SRAM X.5 |
Rear gear set | 11 - 34 Teeth9-speed |
Kona STINKY TL Fork System Data
Derailleur (Front) | SRAM X.7 |
Derailleur (Rear) | SRAM X.7 |
Fork material | Aluminum and magnesium |
Fork type | 160 (millimeters) TravelRock Shox Domain R CL |
Other Specs of Kona STINKY TL
Component group sets | Mountain Mix |
Pedals details | Kona Jackshit |
Rear shock absorber | 160 (millimeters) TravelKona and Fastrax Coil R |
Saddle seat | WTB Pure V Comp |
Seat post extension | Kona DH |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice | -Brushed |
Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR LeversShimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-holeMavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-buttedWheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches)Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) SpindleShimano BB-M950 |
Crankset parts and sizes | 24/34/46 TeethShimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters)Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp CrownAluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) TravelRock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) DiameterSyncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Kona provided us with the latest version of its STINKY TL bike manual
- Find All parts, tires and accessories of Kona STINKY TL Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here