Kona THE KING 2006 VS Merlin CRITICAL PATH 1998 specs comparison

Kona The King 2006 comparison online with competitors

Kona The King

General Infos
Model The King
Manufacturer Kona
Year of production 2006
Current price Check price Here ==>   
Color choice -Blue and White
Sizes - 14 (inches)
- 16 (inches)
- 17 (inches)
- 18 (inches)
- 19 (inches)
- 20 (inches)
- 22 (inches)
Sizes - 14 (inches)
- 16 (inches)
- 17 (inches)
- 18 (inches)
- 19 (inches)
- 20 (inches)
- 22 (inches)

Wheels And Breaking System

Bike front tire26 X 2.20 (inches) Nokian NBX Lite Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes Hydraulic HFX-9 XC Carbon Levers
Hayes Hydraulic HFX-9 XC Carbon Brakes
Hubs for disc brakesFSA X300
Rims manufacturerFSA X300 Wheelset
Spoke nipples typeNot Available
Spoke wheelFSA Stainless Steel

Frame and Body Specs

Frame materialsKona Scandium Butted 4 (inches) Travel
Frame typeTIG-welded
Handlebar constructionRace Face Evolve Low Riser XC
Handlebar extenderOptional
Handlebar stem detailsRace Face Evolve XC
Headset sizeAheadset SAS

Gearing Specifications

Bicycle chainShimano CN-HG53
Bottom bracket shell widthNot Available
Bottom bracket typeRace Face Evolve XC X-Type
Crankset parts and sizes 22/32/44 Teeth
Race Face Evolve XC X-type
Gear shift leversShimano Deore XT
Rear gear set 11 - 32 Teeth
9-speed

Kona The King Fork System Data

Derailleur (Front)Shimano Deore XT
Derailleur (Rear)Shimano Deore XT
Fork material Single Crown
Aluminum and magnesium
Fork typeFox Float RP3

Other Specs of Kona The King

Component group setsShimano Deore XT
Pedals detailsShimano PD-M520 Clipless
Rear shock absorber 4 (inches) Travel
Fox F100RL
Saddle seatWTB Rocket V Race Carbon
Seat post extensionRace Face Evolve XC


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....