Lenz Sport BOULDERVORE XC (02) 1998 VS Merlin CRITICAL PATH 1998 specs comparison
Lenz Sport Bouldervore XC (02)
General InfosModel | Bouldervore XC (02) |
Manufacturer | Lenz Sport |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
- grey anodized - yellow -Green |
Sizes |
- 16 (inches) - 18 (inches) - 20 (inches) |
Sizes |
- 16 (inches) - 18 (inches) - 20 (inches) |
Wheels And Breaking System
Bike front tire | Not Available |
Bike rear tire | Not Available |
Bike wheel size | Not Available |
Brakeset type | Shimano XTR Front and Hayes Hydraulic Rear Rear Levers Shimano XTR V-brake Front and Hayes Hydraulic Disc Brakes |
Hubs for disc brakes | Rear: Hayes and Hugi Front: Shimano XTR |
Rims manufacturer | Not Available |
Spoke nipples type | Not Available |
Spoke wheel | Not Available |
Frame and Body Specs
Frame materials | 6061 T6 Aluminum |
Frame type | Monocoque |
Handlebar construction | Kore Elite |
Handlebar extender | Optional |
Handlebar stem details | Kore Elite |
Headset size | 1 1/8 (inches) Threadless |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) UG |
Bottom bracket shell width | 73 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 12 - 32 Teeth 8-speed |
Lenz Sport Bouldervore XC (02) Fork System Data
Derailleur (Front) | Shimano XTR Top-swing |
Derailleur (Rear) | Shimano XTR SGS Rapid Rise |
Fork material | Triple-clamp Crown Aluminum |
Fork type | Marzocchi Bomber Z-2 Atom Bomb |
Other Specs of Lenz Sport Bouldervore XC (02)
Component group sets | Shimano XTR |
Pedals details | Not Available |
Rear shock absorber | 4.5 (inches) Travel Fox Alps-5R |
Saddle seat | Not Available |
Seat post extension | 27.2 (millimeters) Diameter Kore |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Lenz Sport provided us with the latest version of its Bouldervore XC (02) bike manual
- Find All parts, tires and accessories of Lenz Sport Bouldervore XC (02) Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here