Litespeed UNICOI (01) 2001 VS Merlin CRITICAL PATH 1998 specs comparison

Litespeed Unicoi (01) 2001 comparison online with competitors

Litespeed Unicoi (01)

General Infos
Model Unicoi (01)
Manufacturer Litespeed
Year of production 2001
Current price Check price Here ==>   
Color choice - Brushed
- Dark Blue metallic
- Light Green metallic
- Orange pearl
- Red
- Silver and Blue metallic
- White pearl
- Yellow
-Black Metallic
Sizes - 14 (inches)
- 16.5 (inches)
- 18 (inches)
- 19.5 (inches)
Sizes - 14 (inches)
- 16.5 (inches)
- 18 (inches)
- 19.5 (inches)

Wheels And Breaking System

Bike front tire26 X 2.00 (inches) Hutchinson Mosquito
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano Deore XT Levers
Shimano Deore XT V-brake Brakes
Hubs for disc brakesShimano Deore XT
Rims manufacturer 32-hole
Mavic X517
Spoke nipples typeAluminum Nipples
Spoke wheel 1.8 (millimeters) Front
2.0 (millimeters) Rear Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3AL and 2.5V Geometrically Enhanced Tubing
Frame typeTIG-welded
Handlebar constructionLitespeed Aluminum
Handlebar extenderOptional
Handlebar stem detailsThomson Elite
Headset size1 1/8 (inches) Cane Creek C2

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG92
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 114 (millimeters) Spindle
Shimano BB-ES70
Crankset parts and sizes 22/32/42 Teeth
Shimano Deore XT
Gear shift leversShimano Deore XT RapidFire SL
Rear gear set 11 - 32 Teeth
9-speed

Litespeed Unicoi (01) Fork System Data

Derailleur (Front) Top-pull and clamp-on 35.0 (millimeters)
Shimano Deore XT
Derailleur (Rear)Shimano Deore XT SGS
Fork material Single Triple-clamp Crown
Aluminum
Fork type 2.0 (inches) Travel
Rock Shox Sid XC

Other Specs of Litespeed Unicoi (01)

Component group setsShimano Deore XT
Pedals detailsOptional
Rear shock absorber 1.0 (inches) Travel
Rock Shox SID Adjust
Saddle seatSelle Italia Flite
Seat post extension 27.2 (millimeters) Diameter
Thomson Elite


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....