Marin QUAKE 7.9 2010 VS Merlin CRITICAL PATH 1998 specs comparison

Marin Quake 7.9 2010 comparison online with competitors

Marin Quake 7.9

General Infos
Model Quake 7.9
Manufacturer Marin
Year of production 2010
Current price Check price Here ==>   
Color choice -Team Cyan Blue
Sizes - Small
- medium
- large
Sizes - Small
- medium
- large

Wheels And Breaking System

Bike front tire26 X 2.50 (inches) Kenda Nevegal
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano Saint Levers
Shimano Saint Brakes
Hubs for disc brakes Rear: Shimano Saint 150 X 12 (millimeters)
Front: Shimano Saint 20 (millimeters)
Rims manufacturer 32-hole
Mavic EX325
Spoke nipples typeNot Available
Spoke wheel 14ga.
DT Swiss Stainless

Frame and Body Specs

Frame materials6061 Custom Butted and Hydraformed Aluminum
Frame typeTIG-welded
Handlebar constructionSyncros FR 2014 Alloy OS
Handlebar extenderOptional
Handlebar stem details 20 (millimeters) Rise
Syncros FR
Headset size1.5 (inches) Integrated Orbit E 1.5

Gearing Specifications

Bicycle chainShimano HG73
Bottom bracket shell widthNot Available
Bottom bracket typeShimano Hollowtech II
Crankset parts and sizes 22/36 Teeth
Shimano Saint With E.13 DRS and bashguard
Gear shift levers 2 Way And Instant Release
Shimano Saint
Rear gear set 11 - 34 Teeth
9-speed

Marin Quake 7.9 Fork System Data

Derailleur (Front) Chain Retention Device and clamp-on
Shimano SLX
Derailleur (Rear)Shimano Saint
Fork materialSingle
Fork type 180 (millimeters) Travel
RockShox Totem Coil

Other Specs of Marin Quake 7.9

Component group setsShimano Saint
Pedals detailsSyncros Meat Hook
Rear shock absorber 180 (millimeters) Travel
RockShox Vivid Coil
Saddle seatWTB Pure V Race
Seat post extension 25 (millimeters) Offset
30.9 (millimeters) Diameter
400 (millimeters)
Syncros Derived


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....