Marin WOLF RIDGE 6.9 2009 VS Merlin CRITICAL PATH 1998 specs comparison

Marin Wolf Ridge 6.9 2009 comparison online with competitors

Marin Wolf Ridge 6.9

General Infos
Model Wolf Ridge 6.9
Manufacturer Marin
Year of production 2009
Current price Check price Here ==>   
Color choice -White Pearl
Sizes - Small
- medium
- large
Sizes - Small
- medium
- large

Wheels And Breaking System

Bike front tire26 X 2.35 Kenda Nevegal
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid Elixir CR Levers
Avid Elixir CR With 180 (millimeters) Rotor Front and Avid Elixir CR With 160 (millimeters) Rotor Rear Brakes
Hubs for disc brakes Rear: Sun Ringle Jumping Flea 12 (millimeters)
Front: Sun Ringle Jumping Flea DH 20 (millimeters)
Rims manufacturer 32-hole
Mavic XM-719 Disc
Spoke nipples typeNot Available
Spoke wheel 15ga.
DT Swiss Stainless

Frame and Body Specs

Frame materials6061 Hydroformed Aluminum
Frame typeTIG-welded
Handlebar constructionRace Face Atlas AM 31.8
Handlebar extenderOptional
Handlebar stem detailsRace Face Evolve AM 31.8
Headset size1 1/8 (inches) FSA Orbit MX

Gearing Specifications

Bicycle chainSRAM PC-951
Bottom bracket shell widthNot Available
Bottom bracket typeFSA Mega EXO
Crankset parts and sizes 22/32/44 Teeth
FSA Gravity Light MegaExo
Gear shift leversShimano XT Rapid Fire
Rear gear set 11 - 34 Teeth
9-speed

Marin Wolf Ridge 6.9 Fork System Data

Derailleur (Front)Shimano XT
Derailleur (Rear)Shimano XT Shadow
Fork materialSingle
Fork type 110 - 140 (millimeters) Adjustable Travel
RockShox Pike 454 U-turn Air

Other Specs of Marin Wolf Ridge 6.9

Component group setsShimano XT
Pedals detailsShimano PD-M424
Rear shock absorber 140 (millimeters) Travel
Fox Float RP23
Saddle seatWTB Pure V Race
Seat post extension 30.9 (millimeters) Diameter
Race Face Evolve


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....