Merlin CRITICAL PATH 1998 VS AMP Research B-5 LONG TRAVEL ALL COUNTRY XT 2001 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice | -Brushed |
Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR LeversShimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-holeMavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-buttedWheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches)Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) SpindleShimano BB-M950 |
Crankset parts and sizes | 24/34/46 TeethShimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters)Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp CrownAluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) TravelRock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) DiameterSyncros Hardcore Aluminum |
AMP Research B-5 Long Travel All Country XT
General InfosModel | B-5 Long Travel All Country XT |
Manufacturer | AMP Research |
Year of production | 2001 |
Current price | Check price Here ==> |
Color choice | - Solar Yellow-Polished |
Sizes | - Large - medium - small |
Wheels And Breaking System
Bike front tire | Rear: 26 X 1.95 (inches) Specialized Team MasterFront: 26 X 2.00 (inches) Specialized Team Control |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano Deore XT RapidFire SL LeversAMP D-1 Hydraulic Disc Brakes |
Hubs for disc brakes | Rear: Shimano Deore LXFront: AMP Research D-1 |
Rims manufacturer | 32-holeSun Rims CR18 |
Spoke nipples type | Aluminum Nipples |
Spoke wheel | 2.0 (millimeters) Straight GaugeDT Stainless Steel |
Frame and Body Specs
Frame materials | Alcoa 6061 T6 Aluminum |
Frame type | TIG-welded |
Handlebar construction | 1.5 (inches) RiseAluminum |
Handlebar extender | Optional |
Handlebar stem details | Aluminum |
Headset size | 1 1/8 (inches) Threadless Aheadset |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches)Shimano CN-HG92 |
Bottom bracket shell width | Not Available |
Bottom bracket type | 110 (millimeters) SpindleShimano BB-UN72 |
Crankset parts and sizes | 22/32/44 TeethShimano Deore XT |
Gear shift levers | Shimano Deore XT RapidFire SL |
Rear gear set | 12 - 34 Teeth9-speed |
AMP Research B-5 Long Travel All Country XT Fork System Data
Derailleur (Front) | Bottom-pull Clamp-on 1 3/8 (inches)Shimano Deore XT |
Derailleur (Rear) | Shimano Deore XT GS |
Fork material | Linkage CrownAluminum |
Fork type | 3.5 (inches) TravelAMP Research F-4 BLT |
Other Specs of AMP Research B-5 Long Travel All Country XT
Component group sets | Shimano Deore XT |
Pedals details | Alloy Platform |
Rear shock absorber | 5.0 (inches) TravelAMP Research |
Saddle seat | Specialized |
Seat post extension | 31.6 (millimeters) DiameterJD Components 495 |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your AMP Research B-5 Long Travel All Country XT manual book version yo know further about this bike
- Saddles, tires And mechanical parts for AMP Research B-5 Long Travel All Country XT Mountain bike here