Merlin CRITICAL PATH 1998 VS Balance FS 350 1998 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Balance FS 350
General InfosModel | FS 350 |
Manufacturer | Balance |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Ball-burnished to green fade |
Sizes |
- 14 (inches) - 16 (inches) - 17.5 (inches) - 19 (inches) - 20.5 (inches) |
Wheels And Breaking System
Bike front tire | Rear: 26 X 1.95 (inches) Tioga Psycho TT Front: 26 X 1.95 (inches) Tioga Psycho KS |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Dia-Compe DP-7 Levers Dia-Compe VC-747 Brakes |
Hubs for disc brakes | Rear: Shimano STX-RC Front: Shimano Alivio |
Rims manufacturer | 32-hole Araya GP-710 |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Straight Gauge Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | Butted 7005 Aluminum |
Frame type | TIG-welded |
Handlebar construction | Balance RID |
Handlebar extender | Optional |
Handlebar stem details | Balance RID |
Headset size | 1 1/8 (inches) Threadless Aheadset |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG51 |
Bottom bracket shell width | Not Available |
Bottom bracket type | Shimano BB-LP26 |
Crankset parts and sizes | 24/34/42 Teeth Shimano Alivio |
Gear shift levers | Shimano STX-RC RapidFire SL |
Rear gear set | 7-speed |
Balance FS 350 Fork System Data
Derailleur (Front) | Shimano Alivio Top-swing |
Derailleur (Rear) | Shimano STX-RC |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy C |
Other Specs of Balance FS 350
Component group sets | Mountain Mix |
Pedals details | Aluminum Body With Clips & Straps Steel Cage |
Rear shock absorber | 3.5 (inches) Travel Dyna-mount |
Saddle seat | Balance |
Seat post extension | 27.0 (millimeters) Diameter Balance RID |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Balance FS 350 manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Balance FS 350 Mountain bike here