Merlin CRITICAL PATH 1998 VS Balance FS PRO 750 (02) 1996 specs comparison

🔥 Compare prices & customer reviews on Amazon
✔ Free shipping on many items • ✔ Easy returns • ✔ Trusted store
➜ Merlin Critical Path price ➜ Balance FS Pro 750 (02) price
Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price 🛒 View Price →     
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Balance FS Pro 750 (02) 1996 comparison online with competitors

Balance FS Pro 750 (02)

General Infos
Model FS Pro 750 (02)
Manufacturer Balance
Year of production 1996
Current price 🛒 View Price →     
Color choice - saphire and polished fade
-Clear-coat
Sizes - 16 (inches)
- 17.5 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire Rear: 26 X 1.95 (inches) Tioga Psycho TT Grey
Front: 26 X 1.95 (inches) Tioga Psycho KS Grey
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid Levers
Onza H.O. Brakes
Hubs for disc brakesNot Available
Rims manufacturer 32-hole
Mavic 220
Spoke nipples typeAlloy Nipples
Spoke wheel 1.8 (millimeters) Double Butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials7005 Spiral-X DBT Al. With Replaceable Der. Hanger
Frame typeWelded Aluminum
Handlebar constructionBalance R.I.D.
Handlebar extenderBalance R.I.D. Shorties Alloy
Handlebar stem detailsBalance R.I.D. Forged Alloy
Headset size1 1/8 (inches) Threadless Dia-Compe Kontak Aheadset ST-2

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG70
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 122 (millimeters) Spindle
Shimano BB-UN72
Crankset parts and sizes 22/32/44 Teeth
Adventure Components Race
Gear shift leversGrip Shift SRT-800 X-Ray
Rear gear set 11 - 28 Teeth
8-speed

Balance FS Pro 750 (02) Fork System Data

Derailleur (Front) Top-pull and clamp-on 35.0 (millimeters)
Shimano Deore XT Top-swing
Derailleur (Rear)Shimano Deore XT SGS
Fork material Triple-clamp Crown
Aluminum
Fork typeAnswer Manitou Mach 5 SX

Other Specs of Balance FS Pro 750 (02)

Component group setsShimano Deore XT
Pedals detailsTioga Clipman
Rear shock absorber 3.5 (inches) Travel
RST and Balance
Saddle seatBalance R.I.D. With Suspended Ti Rails
Seat post extension 30.0 (millimeters) Diameter
Balance R.I.D.


Useful links and guides ....