Merlin CRITICAL PATH 1998 VS Beyond Fabrications G3 1997 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Beyond Fabrications G3 1997 comparison online with competitors

Beyond Fabrications G3

General Infos
Model G3
Manufacturer Beyond Fabrications
Year of production 1997
Current price Check price Here ==>   
Color choice - dark green and polished
- red and polished
-Black and polished
Sizes - 16 (inches)
- 17.5 (inches)
- 19 (inches)
- womens 16 (inches)
- womens 17.5 (inches)
- womens 19 (inches)

Wheels And Breaking System

Bike front tire Rear: 26 X 1.95 (inches) Ritchey
Front: 26 X 2.10 (inches) Ritchey
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano Deore XT Levers
Shimano Deore XT V-Brake Brakes
Hubs for disc brakes Rear: Shimano Deore XT
Front: Shimano Deore XT Suspension
Rims manufacturer 32-hole
Ritchey Rock 395
Spoke nipples typeAlloy Nipples
Spoke wheel 1.8 (millimeters) Double Butted
Ritchey Stainless Steel

Frame and Body Specs

Frame materials7005 Aluminum Main Triangle and 6061 Aluminum Rear Stays
Frame typeWelded
Handlebar constructionTitec Enduro
Handlebar extenderOptional
Handlebar stem detailsBeyond
Headset size1 1/8 (inches) Threadless Ritchey Fuzzy Logic

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type113 (millimeters) Spindle
Crankset parts and sizes 22/32/42 Teeth
Shimano Deore XT
Gear shift leversShimano Deore XT RapidFire SL
Rear gear set 11 - 30 Teeth
8-speed

Beyond Fabrications G3 Fork System Data

Derailleur (Front) Top-pull and clamp-on 31.8 (millimeters)
Shimano Deore XT Top-swing
Derailleur (Rear)Shimano Deore XT SGS
Fork material Triple-clamp Crown
Magnesium
Fork typeRock Shox Indy SL

Other Specs of Beyond Fabrications G3

Component group setsShimano Deore XT
Pedals detailsShimano PD-M747 SPD Clipless
Rear shock absorber 3.0 (inches) Travel
Risse
Saddle seatSelle San Marco Bontrager With Chromoly Rails
Seat post extension 27.2 (millimeters) Diameter
Titec Aluminum


Useful links and guides ....