Merlin CRITICAL PATH 1998 VS Brodie RECLUSE 2010 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Brodie Recluse 2010 comparison online with competitors

Brodie Recluse

General Infos
Model Recluse
Manufacturer Brodie
Year of production 2010
Current price Check price Here ==>   
Color choice -Red
Sizes - Extra small
- Small
- Medium
- Large

Wheels And Breaking System

Bike front tire26 X 2.35 (inches) Kenda Kinetics
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid Juicy 3 Levers
Avid Juicy 3 With 8 (inches) Rotor Front and Avid Juicy 3 With 7 (inches) Rotor Rear Brakes
Hubs for disc brakes Rear: Shimano M475
Front: KK Disc 20 (millimeters)
Rims manufacturer 32-hole
Alex DP-20
Spoke nipples typeNot Available
Spoke wheelStainless Steel

Frame and Body Specs

Frame materials7005 aluminum c
Frame typeTIG-welded
Handlebar constructionBrodie Lo Rise
Handlebar extenderOptional
Handlebar stem detailsBrodie 4-bolt
Headset size1 1/8" c

Gearing Specifications

Bicycle chainNot Available
Bottom bracket shell widthNot Available
Bottom bracket typeTruVativ
Crankset parts and sizes 22/32+bash Teeth
Truvativ Ruktion 2.0 With BashGuard
Gear shift leversShimano Deore
Rear gear set 11 - 34 Teeth
9-speed

Brodie Recluse Fork System Data

Derailleur (Front)Shimano Deore
Derailleur (Rear)Shimano Deore
Fork materialSingle
Fork type 160 (millimeters) Travel
Marzocchi 55 RS

Other Specs of Brodie Recluse

Component group setsMountain Mix
Pedals detailsWellgo DH Flats
Rear shock absorber 150 (millimeters) Travel
Marzocchi Roco Coil R
Saddle seatBrodie FR
Seat post extension 31.6 (millimeters) Diameter
Brodie 2-bolt


Useful links and guides ....


A PHP Error was encountered

Severity: Core Warning

Message: PHP Startup: Unable to load dynamic library '/opt/alt/php54/usr/lib64/php/modules/i360.so' - /opt/alt/php54/usr/lib64/php/modules/i360.so: cannot open shared object file: No such file or directory

Filename: Unknown

Line Number: 0

Backtrace: