Merlin CRITICAL PATH 1998 VS Cadillac AM2.4 2005 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice | -Brushed |
Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR LeversShimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-holeMavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-buttedWheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches)Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) SpindleShimano BB-M950 |
Crankset parts and sizes | 24/34/46 TeethShimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters)Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp CrownAluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) TravelRock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) DiameterSyncros Hardcore Aluminum |

Cadillac AM2.4
General InfosModel | AM2.4 |
Manufacturer | Cadillac |
Year of production | 2005 |
Current price | Check price Here ==> |
Color choice | -Black and White |
Sizes | - 17 (inches)- 18 (inches)- 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.35 (inches) Kenda Nevegal |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano BR-M475 Mechanical Disc |
Hubs for disc brakes | Alex Vectra D2 Disc |
Rims manufacturer | Alex Vectra D2 Disc |
Spoke nipples type | Not Available |
Spoke wheel | Not Available |
Frame and Body Specs
Frame materials | 6061 T6 Aluminum |
Frame type | TIG-welded |
Handlebar construction | Guizzo DB OVS 31.8 |
Handlebar extender | Optional |
Handlebar stem details | Aluminum |
Headset size | 1 1/8 (inches) Integrated |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) |
Bottom bracket shell width | Not Available |
Bottom bracket type | Not Available |
Crankset parts and sizes | 22/32/42 TeethTruVativ Five-D |
Gear shift levers | Shimano ST-MC20 |
Rear gear set | 8-speed |
Cadillac AM2.4 Fork System Data
Derailleur (Front) | Shimano FD-MC18-S |
Derailleur (Rear) | Shimano Deore LX SGS |
Fork material | Single CrownAluminum and magnesium |
Fork type | Rock Shox Reba SL |
Other Specs of Cadillac AM2.4
Component group sets | Mountain Mix |
Pedals details | Aluminum Platform |
Rear shock absorber | 4 (inches) - 6 (inches) Adjustable Travel |
Saddle seat | Padded |
Seat post extension | 31.6 (millimeters) DiameterAluminum Micro-adjust |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Cadillac AM2.4 manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Cadillac AM2.4 Mountain bike here