A PHP Error was encountered

Severity: Warning

Message: fopen(/opt/alt/php73/var/lib/php/session/ci_session54bce5fc9981f83904394030f6f42977b3a0c570): failed to open stream: Disk quota exceeded

Filename: drivers/Session_files_driver.php

Line Number: 176

Backtrace:

File: /home7/manyoff1/yobicycle_public_html/index.php
Line: 315
Function: require_once

A PHP Error was encountered

Severity: Warning

Message: session_start(): Failed to read session data: user (path: /opt/alt/php73/var/lib/php/session)

Filename: Session/Session.php

Line Number: 143

Backtrace:

File: /home7/manyoff1/yobicycle_public_html/index.php
Line: 315
Function: require_once

Merlin CRITICAL PATH 1998 VS Caloi SIGMA FS 1997 specs and price comparison online

Merlin CRITICAL PATH 1998 VS Caloi SIGMA FS 1997 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Caloi Sigma FS 1997 comparison online with competitors

Caloi Sigma FS

General Infos
Model Sigma FS
Manufacturer Caloi
Year of production 1997
Current price Check price Here ==>   
Color choice -Polished
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
- 21 (inches)

Wheels And Breaking System

Bike front tire Rear: 26 X 2.10 (inches) Maxxis Gluteus
Front: 26 X 2.10 (inches) Maxxis Instinct
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano STX Levers
Shimano Deore LX V-Brake Brakes
Hubs for disc brakesShimano STX-RC
Rims manufacturer 32-hole
Weinmann Zac 19
Spoke nipples typeBrass Nipples
Spoke wheel 2.0 (millimeters) Straight Gauge
Ta Sen Stainless Steel

Frame and Body Specs

Frame materialsEaston Elan 7005 Aluminum
Frame typeTIG-welded
Handlebar constructionAluminum
Handlebar extenderTranz X
Handlebar stem detailsAluminum
Headset size1 1/8 (inches) Threadless Dia-Compe Aheadset

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG51
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 110 (millimeters) Spindle
Shimano BB-UN52
Crankset parts and sizes 22/32/42 Teeth
Shimano STX
Gear shift leversOptional
Rear gear set 11 - 28 Teeth
8-speed

Caloi Sigma FS Fork System Data

Derailleur (Front) Top-pull and clamp-on 31.8 (millimeters)
Shimano STX
Derailleur (Rear)Shimano Deore LX SGS
Fork material Triple-clamp Crown
Magnesium
Fork typeRock Shox Indy C

Other Specs of Caloi Sigma FS

Component group setsShimano Deore LX and STX
Pedals detailsAluminum Cage With Clips & Straps
Rear shock absorber 4.0 (inches) Travel
Cane Creek AD-4
Saddle seatCaloi Avante SX
Seat post extension 27.0 (millimeters) Diameter
Zoom


Useful links and guides ....