Merlin CRITICAL PATH 1998 VS Cannondale JEKYLL 3000 2002 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Cannondale Jekyll 3000 2002 comparison online with competitors

Cannondale Jekyll 3000

General Infos
Model Jekyll 3000
Manufacturer Cannondale
Year of production 2002
Current price Check price Here ==>   
Color choice -Ball Burnished Aluminum
Sizes - Small
- Medium
- Large
- Extra large

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) Hutchinson Scorpion Tubeless
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes Hydraulic Disc Levers
Hayes HFX Magnesium Hydraulic Brakes
Hubs for disc brakes Rear: DT Swiss 240
Front: Cannondale Lefty
Rims manufacturer 24-hole
Mavic X 3.1
Spoke nipples typeAluminum Nipples
Spoke wheel Double-butted
DT Stainless Steel

Frame and Body Specs

Frame materials6013 T6 Aluminum
Frame typeTIG-welded
Handlebar constructionSyntace VRO
Handlebar extenderOptional
Handlebar stem detailsSyntace VRO
Headset size1 1/2 (inches) Cannondale HeadShok SI

Gearing Specifications

Bicycle chain1/2 X 3/32 (inches)
Bottom bracket shell widthNot Available
Bottom bracket type 109.5 (millimeters) Spindle
Shimano BB-ES72
Crankset parts and sizes 22/32/44 Teeth
Cannondale CX3
Gear shift leversShimano XT RapidFire SL
Rear gear set 11 - 34 Teeth
9-speed

Cannondale Jekyll 3000 Fork System Data

Derailleur (Front)Shimano XT
Derailleur (Rear)Shimano XTR SGS
Fork material Double Double-clamp Crown
Aluminum
Fork typeHeadShok Lefty ELO

Other Specs of Cannondale Jekyll 3000

Component group setsMountain Mix
Pedals detailsShimano Clipless
Rear shock absorberFox Float RL
Saddle seat Titanium Rails
Fi'zi:k Plateau
Seat post extensionCannondale Competition


Useful links and guides ....