Merlin CRITICAL PATH 1998 VS Cannondale PERP 2 2009 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Cannondale Perp 2
General InfosModel | Perp 2 |
Manufacturer | Cannondale |
Year of production | 2009 |
Current price | Check price Here ==> |
Color choice |
-Lightning White and Purple splatter |
Sizes |
- Small - Medium - Large - Extra large |
Wheels And Breaking System
Bike front tire | 26 X 2.50 (inches) Kenda Nevegal |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid Juicy 3 Levers Avid Juicy 3 With 203 (millimeters) Rotor Brakes |
Hubs for disc brakes | Rear: Sun Ringle Abbah Lawwill Thru-12 Front: Thru-20 |
Rims manufacturer | 36-hole Mavic EX325 |
Spoke nipples type | Not Available |
Spoke wheel | DT Swiss Champion |
Frame and Body Specs
Frame materials | Aluminum |
Frame type | TIG-welded |
Handlebar construction | Truvativ Hussefelt Riser |
Handlebar extender | Optional |
Handlebar stem details | Cannondale Freeride |
Headset size | 1 1/2 (inches) Cannondale Orbit Xtreme Pro |
Gearing Specifications
Bicycle chain | Shimano 9 Speed |
Bottom bracket shell width | Not Available |
Bottom bracket type | TruVativ Howitzer |
Crankset parts and sizes | 24/36 Teeth Truvativ Ruktion 2.0 With BashGuard |
Gear shift levers | SRAM X.7 Trigger |
Rear gear set | 11 - 34 Teeth 9-speed |
Cannondale Perp 2 Fork System Data
Derailleur (Front) | Shimano SLX |
Derailleur (Rear) | SRAM X.9 Mid Cage |
Fork material | Single Crown Aluminum and magnesium |
Fork type | 180 (millimeters) Travel RockShox Totem IS Coil |
Other Specs of Cannondale Perp 2
Component group sets | SRAM Mix |
Pedals details | Cannondale Grind EX Platform |
Rear shock absorber | 180 - 200 (millimeters) Adjustable Travel Fox Van R |
Saddle seat | Velo 2051 FR |
Seat post extension | 27.2 (millimeters) Diameter Cannondale C4 Alloy |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Cannondale Perp 2 manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Cannondale Perp 2 Mountain bike here