Merlin CRITICAL PATH 1998 VS Cannondale PROPHET 2 2008 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Cannondale Prophet 2 2008 comparison online with competitors

Cannondale Prophet 2

General Infos
Model Prophet 2
Manufacturer Cannondale
Year of production 2008
Current price Check price Here ==>   
Color choice -Stealth Grey
Sizes - Small
- Medium
- Large
- Extra large

Wheels And Breaking System

Bike front tire26 X 2.35 Maxxis Ignitor UST
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid Juicy 5 Hydraulic Disc Levers
Avid Juicy 5 Hydraulic With 185 (millimeters) Rotor Front and Avid Juicy 5 Hydraulic With 160 (millimeters) Rotor Rear Brakes
Hubs for disc brakesShimano M525 Disc
Rims manufacturer 32-hole
DT Swiss XR 4.2D
Spoke nipples typeNot Available
Spoke wheelDT Swiss Champion Stainless Steel

Frame and Body Specs

Frame materialsAluminum
Frame typeTIG-welded
Handlebar construction 31.8 (millimeters)
FSA XC-281AOS
Handlebar extenderNot Available
Handlebar stem detailsCannondale XC3
Headset size1 1/8 (inches) Threadless Cannondale Converter

Gearing Specifications

Bicycle chainShimano 9 Speed
Bottom bracket shell width68 (millimeters) English
Bottom bracket typeSRAM GXP
Crankset parts and sizes 22/32/44 Teeth
SRAM GXP2
Gear shift leversSRAM X-7 Trigger
Rear gear set 11 - 34 Teeth
9-speed

Cannondale Prophet 2 Fork System Data

Derailleur (Front)Shimano LX
Derailleur (Rear)SRAM X.9
Fork material Single Crown
Aluminum and magnesium
Fork type 140 (millimeters) Travel
Fox 32 RL

Other Specs of Cannondale Prophet 2

Component group setsMountain Mix
Pedals detailsCrank Brothers Smarty
Rear shock absorber 140 (millimeters) Travel
Fox Float RP2
Saddle seatFi'zi:k Nisene Sport Mg
Seat post extension 27.2 (millimeters) Diameter
FSA FR-270


Useful links and guides ....