Merlin CRITICAL PATH 1998 VS Cannondale RZ ONE FORTY 3 2010 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
![Cannondale RZ One Forty 3 2010 comparison online with competitors](https://yobicycle.com/images/models/Cannondale-RZ-One-Forty-3-2010-specs.jpg)
Cannondale RZ One Forty 3
General InfosModel | RZ One Forty 3 |
Manufacturer | Cannondale |
Year of production | 2010 |
Current price | Check price Here ==> |
Color choice |
- Ruby Red -Jet Black |
Sizes |
- S - M - L - X |
Wheels And Breaking System
Bike front tire | 26 X 2.25 (inches) Schwalbe Nobby Nic |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid Elixer R Levers Avid Elixer R With 180 (millimeters) Rotor Front and Avid Elixer R Disc Rear Brakes |
Hubs for disc brakes | Rear: Sun Dirty Flea Front: Cannondale Lefty SL |
Rims manufacturer | 32-hole DT Swiss X430 |
Spoke nipples type | Not Available |
Spoke wheel | DT Swiss Competition |
Frame and Body Specs
Frame materials | RZ One Forty |
Frame type | TIG-welded |
Handlebar construction | FSA XC 281 |
Handlebar extender | Optional |
Handlebar stem details | Cannondale HeadShok |
Headset size | HeadShok |
Gearing Specifications
Bicycle chain | KMC X9 CP 9-speed |
Bottom bracket shell width | Not Available |
Bottom bracket type | TruVativ GXP |
Crankset parts and sizes | 44/32/22 Teeth Truvativ Stylo 3.2 GXP |
Gear shift levers | SRAM X-9 Trigger |
Rear gear set | 11 - 34 Teeth 9-speed |
Cannondale RZ One Forty 3 Fork System Data
Derailleur (Front) | SRAM X-7 |
Derailleur (Rear) | SRAM X-9 |
Fork material | Dual |
Fork type | 140 (millimeters) Travel Cannondale Lefty Max With PBR |
Other Specs of Cannondale RZ One Forty 3
Component group sets | Mountain Mix |
Pedals details | Crank Brothers Candy |
Rear shock absorber | 140 (millimeters) Travel RockShox Monarch 3.3 |
Saddle seat | Fizik Aliante Delta XM |
Seat post extension | 31.6 (millimeters) Diameter FSA FR-270 |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Cannondale RZ One Forty 3 manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Cannondale RZ One Forty 3 Mountain bike here