Merlin CRITICAL PATH 1998 VS Cannondale SUPER V 700SX 2000 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Cannondale Super V 700SX 2000 comparison online with competitors

Cannondale Super V 700SX

General Infos
Model Super V 700SX
Manufacturer Cannondale
Year of production 2000
Current price Check price Here ==>   
Color choice - Team Yellow
-Super Black
Sizes - Small
- Medium
- Large
- Extra large

Wheels And Breaking System

Bike front tire26 X 2.00 (inches) Hutchinson Alligator
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Magura Clara Front and Magura HS 11 Rear Levers
Magura Clara Hydraulic Disc Front and Magura HS 11 Rear Brakes
Hubs for disc brakes Rear: CODA Performance Disc
Front: CODA Lefty
Rims manufacturer 32-hole
Rear: CODA Expert
Front: CODA Expert Disc
Spoke nipples typeBrass Nipples
Spoke wheel 2.0 (millimeters) Double-butted
DT Stainless Steel

Frame and Body Specs

Frame materials6061 T6 Aluminum
Frame typeTIG-welded
Handlebar constructionCODA Riser
Handlebar extenderOptional
Handlebar stem detailsCODA HeadShok Front Loader
Headset sizeCannondale Oversize CODA HeadShok

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
SRAM PC-59
Bottom bracket shell widthNot Available
Bottom bracket typeShimano Cartridge
Crankset parts and sizes 22/32/44 Teeth
CODA CF1
Gear shift leversShimano Deore Rapidfire Plus
Rear gear set 11 - 32 Teeth
9-speed

Cannondale Super V 700SX Fork System Data

Derailleur (Front)Shimano Deore Top-swing
Derailleur (Rear)Shimano Deore XT SGS
Fork material Single Triple-clamp Crown
Aluminum
Fork type 4.0 (inches) Travel
Headshok Lefty DLR

Other Specs of Cannondale Super V 700SX

Component group setsMountain Mix
Pedals detailsCODA 500M
Rear shock absorberFox Float
Saddle seatCODA Expert
Seat post extensionKalloy SP-263


Useful links and guides ....