Merlin CRITICAL PATH 1998 VS Chumba EVO (MAVERICK FORK) 2007 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Chumba EVO (Maverick Fork)
General InfosModel | EVO (Maverick Fork) |
Manufacturer | Chumba |
Year of production | 2007 |
Current price | Check price Here ==> |
Color choice |
- Bronze - Gunmetal - Mist Green - White -Black |
Sizes |
- Small/medium - medium/large |
Wheels And Breaking System
Bike front tire | 26 X 2.40 (inches) WTB MotoRaptor |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid Juicy Carbon Levers Avid Juicy 7 Carbon Brakes |
Hubs for disc brakes | Rear: Dt Swiss 340 Disc Front: Maverick 24 (millimeters) Thru-Axle |
Rims manufacturer | 32-hole DT Swiss EX5.1d |
Spoke nipples type | Not Available |
Spoke wheel | DT Swiss Stainless Steel |
Frame and Body Specs
Frame materials | 6061 aluminum c |
Frame type | TIG-welded |
Handlebar construction | TruVativ Team |
Handlebar extender | Optional |
Handlebar stem details | TruVativ Team |
Headset size | 1 1/8 (inches) Threadless WTB Momentum Cartridge |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) SRAM |
Bottom bracket shell width | 73 (millimeters) English |
Bottom bracket type | FSA Mega EXO |
Crankset parts and sizes | 22/32/44 Teeth FSA V-Drive MegaExo |
Gear shift levers | SRAM X.9 Trigger |
Rear gear set | 9-speed |
Chumba EVO (Maverick Fork) Fork System Data
Derailleur (Front) | Bottom-pull and bottom Bracket Mount Shimano XTR |
Derailleur (Rear) | SRAM X.0 Carbon |
Fork material | Dual Crown Aluminum and magnesium |
Fork type | 110 - 150 (millimeters) Adjustable Travel Maverick DUC 32 |
Other Specs of Chumba EVO (Maverick Fork)
Component group sets | Mountain Mix |
Pedals details | Optional |
Rear shock absorber | 6 (inches) Travel Fox DHX Air 5.0 |
Saddle seat | WTB Rocket V |
Seat post extension | 31.6 (millimeters) Diameter TruVativ Team |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Chumba EVO (Maverick Fork) manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Chumba EVO (Maverick Fork) Mountain bike here