Merlin CRITICAL PATH 1998 VS Commencal META 6.1 2009 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |

Commencal Meta 6.1
General InfosModel | Meta 6.1 |
Manufacturer | Commencal |
Year of production | 2009 |
Current price | Check price Here ==> |
Color choice |
-Green |
Sizes |
- Small - medium - large |
Wheels And Breaking System
Bike front tire | 26 X 2.35 (inches) Maxxis High Roller |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Formula K24 Hydraulic Levers Formula Oro K24 With 180 (millimeters) Rotor Brakes |
Hubs for disc brakes | Rear: Sun Ringle Jumping Flea 12 (millimeters) Front: Sun Ringle Jumping Flea DH 20 (millimeters) |
Rims manufacturer | Sun Equalizer 27 |
Spoke nipples type | Not Available |
Spoke wheel | Stainless |
Frame and Body Specs
Frame materials | Neo Ultra |
Frame type | TIG-welded |
Handlebar construction | Co (millimeters)encal Riser OS |
Handlebar extender | Optional |
Handlebar stem details | Race Face Deus |
Headset size | 1 1/2 (inches) Integrated |
Gearing Specifications
Bicycle chain | SRAM |
Bottom bracket shell width | Not Available |
Bottom bracket type | Race Face X-Type |
Crankset parts and sizes | 24/36 Teeth Race Face Deus XC |
Gear shift levers | SRAM X.9 Trigger |
Rear gear set | 11 - 32 Teeth 9-speed |
Commencal Meta 6.1 Fork System Data
Derailleur (Front) | Shimano XT |
Derailleur (Rear) | SRAM X.0 |
Fork material | Single Crown Magnesium and aluminum |
Fork type | 160 (millimeters) Travel Fox 36 Talas RC2 |
Other Specs of Commencal Meta 6.1
Component group sets | SRAM X.9/mix |
Pedals details | Not Available |
Rear shock absorber | 6 (inches) Travel Fox RP23 XV |
Saddle seat | SDG Formula FX |
Seat post extension | Crank Brothers Joplin |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Commencal Meta 6.1 manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Commencal Meta 6.1 Mountain bike here