Merlin CRITICAL PATH 1998 VS Conejo AP/5 AT (09) 1999 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Conejo AP/5 AT (09) 1999 comparison online with competitors

Conejo AP/5 AT (09)

General Infos
Model AP/5 AT (09)
Manufacturer Conejo
Year of production 1999
Current price Check price Here ==>   
Color choice -Not found
Sizes - 14 (inches)
- 16 (inches)
- 18.5 (inches)
- 21 (inches)

Wheels And Breaking System

Bike front tire26 X 1.95 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type SRAM ESP 9.0 Levers
Shimano Deore XT V-Brake Brakes
Hubs for disc brakesShimano Deore XT
Rims manufacturer 32-hole
Mavic X517
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials6061 T6 Aluminum
Frame typeTIG-welded
Handlebar constructionKore Lite
Handlebar extenderOptional
Handlebar stem detailsKore Lite
Headset size1 1/8 (inches) Threadless Aheadset Kontak DL

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG72
Bottom bracket shell widthNot Available
Bottom bracket typeShimano Deore XT
Crankset parts and sizes 22/32/44 Teeth
Shimano Deore XT
Gear shift leversSRAM ESP 9.0
Rear gear set 11 - 32 Teeth
9-speed

Conejo AP/5 AT (09) Fork System Data

Derailleur (Front)Shimano Deore XT Top-swing
Derailleur (Rear)SRAM ESP 9.0
Fork material Triple-clamp Crown
Aluminum
Fork type 2.75 (inches) Travel
Marzocchi Bomber Z-2 Super Fly

Other Specs of Conejo AP/5 AT (09)

Component group setsMountain Mix
Pedals detailsOptional
Rear shock absorber 4.5 (inches)-6.5 (inches) Adjustable Travel
Fox Vanilla RC
Saddle seatSDG Slim Jim
Seat post extensionKore Lite


Useful links and guides ....