Merlin CRITICAL PATH 1998 VS Conejo ARS/5 LX JUDY XC 1995 specs comparison
🔥 Compare prices & customer reviews on Amazon
✔ Free shipping on many items • ✔ Easy returns • ✔ Trusted store
➜ Merlin Critical Path price
➜ Conejo ARS/5 LX Judy XC price
Merlin Critical Path
General Infos| Model | Critical Path |
| Manufacturer | Merlin |
| Year of production | 1998 |
| Current price | 🛒 View Price → |
| Color choice | -Brushed |
| Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
| Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
Wheels And Breaking System
| Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
| Bike rear tire | Not Available |
| Bike wheel size | 26 (inches) Wheels |
| Brakeset type | Shimano XTR LeversShimano XTR V-Brake Brakes |
| Hubs for disc brakes | Shimano XTR |
| Rims manufacturer | 32-holeMavic 217 SUP |
| Spoke nipples type | Alloy Nipples |
| Spoke wheel | 2.0 (millimeters) Double-buttedWheelsmith Stainless Steel |
Frame and Body Specs
| Frame materials | 3Al and 2.5V Titanium |
| Frame type | TIG-welded |
| Handlebar construction | Syncros Hardcore |
| Handlebar extender | Optional |
| Handlebar stem details | Syncros Hardcore |
| Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
| Bicycle chain | 1/2 X 3/32 (inches)Shimano CN-IG90 |
| Bottom bracket shell width | 68 (millimeters) English |
| Bottom bracket type | 112.5 (millimeters) SpindleShimano BB-M950 |
| Crankset parts and sizes | 24/34/46 TeethShimano XTR M950 |
| Gear shift levers | Shimano XTR RapidFire SL |
| Rear gear set | 11 - 34 Teeth8-speed |
Merlin Critical Path Fork System Data
| Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters)Shimano XTR |
| Derailleur (Rear) | Shimano XTR SGS |
| Fork material | Triple-clamp CrownAluminum and magnesium |
| Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
| Component group sets | Shimano XTR |
| Pedals details | Optional |
| Rear shock absorber | 3.5 (inches) TravelRock Shox Super Deluxe |
| Saddle seat | Bontrager With Titanium Rails |
| Seat post extension | 27.2 (millimeters) DiameterSyncros Hardcore Aluminum |
Conejo ARS/5 LX Judy XC
General Infos| Model | ARS/5 LX Judy XC |
| Manufacturer | Conejo |
| Year of production | 1995 |
| Current price | 🛒 View Price → |
| Color choice | -Black-yellow |
| Sizes | - 16 (inches)- 18.5 (inches)- 21 (inches)- womens 16 (inches)- womens 18.5 (inches)- womens 21 (inches) |
Wheels And Breaking System
| Bike front tire | Rear: 26 X 2.10 (inches) Onza HonchFront: 26 X 2.10 (inches) Onza Aggro |
| Bike rear tire | Not Available |
| Bike wheel size | 26 (inches) Wheels |
| Brakeset type | Shimano Deore LX LeversShimano Deore LX M-System Brakes |
| Hubs for disc brakes | Shimano Deore LX With Suspension Front Axle |
| Rims manufacturer | 32-hole Rear: Bontrager BCX-3Front: Bontrager BCX-2 |
| Spoke nipples type | Brass Nipples |
| Spoke wheel | Straight GaugeWheelsmith Stainless Steel |
Frame and Body Specs
| Frame materials | Tange Prestige Chromoly and Alcoa 6061 T6 Aluminum Swing Arm |
| Frame type | TIG-welded Steel and welded Aluminum |
| Handlebar construction | Bontrager Titec 140g |
| Handlebar extender | Optional |
| Handlebar stem details | Kalloy A-Head Type |
| Headset size | 1 (inches) Dia-Compe Kontak Aheadset DL |
Gearing Specifications
| Bicycle chain | 1/2 X 3/32 (inches)KMC SS-90 |
| Bottom bracket shell width | Not Available |
| Bottom bracket type | Not Available |
| Crankset parts and sizes | 22/32/42 TeethShimano Deore LX HyperDrive-C |
| Gear shift levers | Shimano Deore LX RapidFire Plus |
| Rear gear set | 11 - 28 Teeth8-speed |
Conejo ARS/5 LX Judy XC Fork System Data
| Derailleur (Front) | Bottom-pull and clamp-on 28.6 (millimeters)Shimano Deore LX Compact Drive |
| Derailleur (Rear) | Shimano Deore LX SGS |
| Fork material | Triple-clamp CrownMagnesium |
| Fork type | Rock Shox Judy XC |
Other Specs of Conejo ARS/5 LX Judy XC
| Component group sets | Shimano Deore LX |
| Pedals details | Odyssey Svelte Comp |
| Rear shock absorber | Not Available |
| Saddle seat | Chromoly RailsSelle San Marco Bontrager |
| Seat post extension | 26.8 (millimeters) DiameterKalloy Uno |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Conejo ARS/5 LX Judy XC manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Conejo ARS/5 LX Judy XC Mountain bike here