Merlin CRITICAL PATH 1998 VS Conejo RBX5 (29) 1998 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Conejo RBx5 (29) 1998 comparison online with competitors

Conejo RBx5 (29)

General Infos
Model RBx5 (29)
Manufacturer Conejo
Year of production 1998
Current price Check price Here ==>   
Color choice - dark green
- red
- yellow
-Black
Sizes - 16 (inches)
- 18.5 (inches)
- 21 (inches)

Wheels And Breaking System

Bike front tire Rear: 26 X 2.00 (inches) Geax Hook 200
Front: 26 X 2.15 (inches) Geax Warp 215
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Sun Rims CR18
Spoke nipples typeBrass Nipples
Spoke wheel 2.0 (millimeters) Straight Gauge
Stainless Steel

Frame and Body Specs

Frame materials6061 T6 Aluminum
Frame typeTIG-welded
Handlebar constructionControl Tech Aluminum
Handlebar extenderOptional
Handlebar stem detailsControl Tech
Headset size1 1/8 (inches) Threadless Aheadset Kontak DL

Gearing Specifications

Bicycle chain1/2 X 3/32 (inches)
Bottom bracket shell widthNot Available
Bottom bracket typeShimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 32 Teeth
8-speed

Conejo RBx5 (29) Fork System Data

Derailleur (Front)Shimano XTR Top-swing
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum
Fork typeMarzocchi Bomber Z-1 BAM

Other Specs of Conejo RBx5 (29)

Component group setsShimano XTR
Pedals detailsOdyssey Svelte Pro
Rear shock absorber 5.0 (inches) Travel
Fox Alps-5R
Saddle seat Titanium Rails
SDG Ventura Comp
Seat post extensionControl Tech Control Post


Useful links and guides ....