Merlin CRITICAL PATH 1998 VS Crosstrac SONOMA ULTRA 1995 specs comparison
🔥 Compare prices & customer reviews on Amazon
✔ Free shipping on many items • ✔ Easy returns • ✔ Trusted store
➜ Merlin Critical Path price
➜ Crosstrac Sonoma Ultra price
Merlin Critical Path
General Infos| Model | Critical Path |
| Manufacturer | Merlin |
| Year of production | 1998 |
| Current price | 🛒 View Price → |
| Color choice | -Brushed |
| Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
| Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
Wheels And Breaking System
| Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
| Bike rear tire | Not Available |
| Bike wheel size | 26 (inches) Wheels |
| Brakeset type | Shimano XTR LeversShimano XTR V-Brake Brakes |
| Hubs for disc brakes | Shimano XTR |
| Rims manufacturer | 32-holeMavic 217 SUP |
| Spoke nipples type | Alloy Nipples |
| Spoke wheel | 2.0 (millimeters) Double-buttedWheelsmith Stainless Steel |
Frame and Body Specs
| Frame materials | 3Al and 2.5V Titanium |
| Frame type | TIG-welded |
| Handlebar construction | Syncros Hardcore |
| Handlebar extender | Optional |
| Handlebar stem details | Syncros Hardcore |
| Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
| Bicycle chain | 1/2 X 3/32 (inches)Shimano CN-IG90 |
| Bottom bracket shell width | 68 (millimeters) English |
| Bottom bracket type | 112.5 (millimeters) SpindleShimano BB-M950 |
| Crankset parts and sizes | 24/34/46 TeethShimano XTR M950 |
| Gear shift levers | Shimano XTR RapidFire SL |
| Rear gear set | 11 - 34 Teeth8-speed |
Merlin Critical Path Fork System Data
| Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters)Shimano XTR |
| Derailleur (Rear) | Shimano XTR SGS |
| Fork material | Triple-clamp CrownAluminum and magnesium |
| Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
| Component group sets | Shimano XTR |
| Pedals details | Optional |
| Rear shock absorber | 3.5 (inches) TravelRock Shox Super Deluxe |
| Saddle seat | Bontrager With Titanium Rails |
| Seat post extension | 27.2 (millimeters) DiameterSyncros Hardcore Aluminum |
Crosstrac Sonoma Ultra
General Infos| Model | Sonoma Ultra |
| Manufacturer | Crosstrac |
| Year of production | 1995 |
| Current price | 🛒 View Price → |
| Color choice | - dark blue- green- light blue- orange- red- teal- white- yellow-Black |
| Sizes | - Xlarge - xsmall - large - medium - small |
Wheels And Breaking System
| Bike front tire | Rear: 26 X 2.10 (inches) Ritchey Omega Bite WCSFront: 26 X 2.10 (inches) Ritchey Alpha Bite WCS |
| Bike rear tire | Not Available |
| Bike wheel size | 26 (inches) Wheels |
| Brakeset type | Ritchey WCS Logic LeversRitchey Logic Brakes |
| Hubs for disc brakes | Shimano Deore XT |
| Rims manufacturer | 32-hole Rear: Ritchey Rock 415Front: Ritchey Rock 395 |
| Spoke nipples type | Brass Nipples |
| Spoke wheel | 1.8 (millimeters) Double ButtedRitchey Stainless Steel |
Frame and Body Specs
| Frame materials | Double-butted Heat-treated6061 T6 Aluminum |
| Frame type | Welded Aluminum |
| Handlebar construction | Ritchey WCS Prolite |
| Handlebar extender | Ritchey Logic WCS |
| Handlebar stem details | Control Tech AheadSet |
| Headset size | 1 1/4 (inches) Dia-Compe S Series Aheadset |
Gearing Specifications
| Bicycle chain | 1/2 X 3/32 (inches)Sachs SC-M55 |
| Bottom bracket shell width | Not Available |
| Bottom bracket type | Not Available |
| Crankset parts and sizes | 24/36/47 TeethKooka |
| Gear shift levers | Grip Shift SRT-600 |
| Rear gear set | 12 - 28 Teeth7-speed |
Crosstrac Sonoma Ultra Fork System Data
| Derailleur (Front) | Bottom-pull and clamp-on 31.8 (millimeters)Shimano Deore XT |
| Derailleur (Rear) | Shimano Deore XT GS |
| Fork material | Bonded Triple-clamp CrownAluminum |
| Fork type | Crosstrac Sonoma |
Other Specs of Crosstrac Sonoma Ultra
| Component group sets | Not Available |
| Pedals details | Ritchey Logic Titanium |
| Rear shock absorber | Not Available |
| Saddle seat | SDG 2000 Kevlar and Titanium Rails |
| Seat post extension | 38.1 (millimeters) DiameterCrosstrac |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Crosstrac Sonoma Ultra manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Crosstrac Sonoma Ultra Mountain bike here