Merlin CRITICAL PATH 1998 VS Dean BAM BAM (09) 1997 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Dean Bam Bam (09) 1997 comparison online with competitors

Dean Bam Bam (09)

General Infos
Model Bam Bam (09)
Manufacturer Dean
Year of production 1997
Current price Check price Here ==>   
Color choice - black chrome
-Black
Sizes - Small
- Medium
- Large
- Extra large

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Rhino Racing V Levers
Rhino Racing V Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeBrass Nipples
Spoke wheel 2.0 (millimeters) Double Butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materialsAlcoa 6113 T6 Aluminum
Frame typeTIG-welded
Handlebar constructionDean Aluminum
Handlebar extenderOptional
Handlebar stem detailsDean Aluminum
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width73 (millimeters) English
Bottom bracket typeShimano BB-UN72
Crankset parts and sizes 24/36/48 Teeth
Rhino Racing
Gear shift leversGrip Shift SRT-800 X-Ray
Rear gear set 12 - 32 Teeth
8-speed

Dean Bam Bam (09) Fork System Data

Derailleur (Front) Top-pull and clamp-on 35.0 (millimeters)
Shimano XTR Top-swing
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum
Fork typeAnswer Manitou SX

Other Specs of Dean Bam Bam (09)

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 4.0 (inches) Travel
Fox Alps-5
Saddle seat Titanium Rails
SDG 2000 Kevlar
Seat post extension 27.2 (millimeters) Diameter
Dean Aluminum


Useful links and guides ....