Merlin CRITICAL PATH 1998 VS Dean DUKE PRO/JUDY RACE 2001 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Dean Duke Pro/Judy Race 2001 comparison online with competitors

Dean Duke Pro/Judy Race

General Infos
Model Duke Pro/Judy Race
Manufacturer Dean
Year of production 2001
Current price Check price Here ==>   
Color choice - Satin
-Brushed
Sizes - Small
- Medium
- Large
- Extra large

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) IRC Mythos XC
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR RapidFire SL Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturerMavic 517
Spoke nipples typeAluminum Nipples
Spoke wheel Double-butted
Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionDean Titanium
Handlebar extenderOptional
Handlebar stem detailsDean Aluminum
Headset size1 1/8 (inches) Threadless Chris King No-Threadset

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano XTR
Bottom bracket shell width68 (millimeters) English
Bottom bracket typeShimano BB-M952
Crankset parts and sizesShimano XTR
Gear shift leversShimano XTR RapidFire SL
Rear gear set Optional Of Gearing
9-speed

Dean Duke Pro/Judy Race Fork System Data

Derailleur (Front) Top-pull and clamp-on 31.8 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Judy Race

Other Specs of Dean Duke Pro/Judy Race

Component group setsMountain Mix
Pedals detailsOptional
Rear shock absorber 1.25 (inches) Travel
Stratos Pro
Saddle seatFi'zi:k: Nisene Ti
Seat post extension 27.2 (millimeters) Diameter
Dean Titanium Ultra-lite


Useful links and guides ....