A PHP Error was encountered

Severity: Warning

Message: fopen(/opt/alt/php73/var/lib/php/session/ci_session96f5c547b8b2d382b06464b4d91c685faad8e6de): failed to open stream: Disk quota exceeded

Filename: drivers/Session_files_driver.php

Line Number: 176

Backtrace:

File: /home7/manyoff1/yobicycle_public_html/index.php
Line: 315
Function: require_once

A PHP Error was encountered

Severity: Warning

Message: session_start(): Failed to read session data: user (path: /opt/alt/php73/var/lib/php/session)

Filename: Session/Session.php

Line Number: 143

Backtrace:

File: /home7/manyoff1/yobicycle_public_html/index.php
Line: 315
Function: require_once

Merlin CRITICAL PATH 1998 VS Devinci BANZAI 1999 specs and price comparison online

Merlin CRITICAL PATH 1998 VS Devinci BANZAI 1999 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Devinci Banzai 1999 comparison online with competitors

Devinci Banzai

General Infos
Model Banzai
Manufacturer Devinci
Year of production 1999
Current price Check price Here ==>   
Color choice -SID Blue and Yellow
Sizes - 16 (inches)
- 17.5 (inches)
- 18.5 (inches)
- 19.5 (inches)
- 21 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) Michelin Wild Gripper Hot S
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes Levers
Hayes Hydraulic Disc Brakes
Hubs for disc brakesMavic Crosslink Disc
Rims manufacturer 28-hole
Mavic Crosslink Disc
Spoke nipples typeBrass Nipples
Spoke wheel 2.0 (millimeters) Straight Gauge
Mavic Stainless Steel

Frame and Body Specs

Frame materialsAlcoa 6061 T6 Aluminum
Frame typeTIG-welded
Handlebar constructionTitec Enduro Hell Bent XC
Handlebar extenderOptional
Handlebar stem detailsTitec Big AL
Headset size1 1/8 (inches) Threadless WTB Momentum Grease Guard

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG92
Bottom bracket shell width73 (millimeters) English
Bottom bracket type 110 (millimeters) Spindle
Shimano BB-UN72
Crankset parts and sizes 22/32/44 Teeth
Shimano Deore XT
Gear shift leversShimano Deore XT RapidFire SL
Rear gear set 11 - 32 Teeth
9-speed

Devinci Banzai Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 31.8 (millimeters)
Shimano Deore XT
Derailleur (Rear)Shimano XTR SGS
Fork material Double Triple-clamp Crown
Aluminum and magnesium
Fork type 4.0 (inches) Travel
Rock Shox Sid XL

Other Specs of Devinci Banzai

Component group setsMountain Mix
Pedals detailsTime Alium
Rear shock absorber 4.0 (inches) Travel
Rock Shox Sid
Saddle seat Titanium Rails With Kevlar Sides
WTB SSTK
Seat post extension 27.2 (millimeters) Diameter
Titec AL-235


Useful links and guides ....