Merlin CRITICAL PATH 1998 VS Diamondback V-6 TEAM 1998 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Diamondback V-6 Team 1998 comparison online with competitors

Diamondback V-6 Team

General Infos
Model V-6 Team
Manufacturer Diamondback
Year of production 1998
Current price Check price Here ==>   
Color choice -Team Yellow
Sizes - Medium
- small

Wheels And Breaking System

Bike front tire26 X 1.95 (inches) WTB Racing Raptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid SD-1.9 L Levers
Avid 1D-20 Brakes
Hubs for disc brakes Rear: Shimano Deore LX
Front: WTB Momentum
Rims manufacturer 32-hole
Mavic X221
Spoke nipples typeAlloy Nipples
Spoke wheel 1.8 (millimeters) Double-butted
WTB Stainless Steel

Frame and Body Specs

Frame materialsCarbon Fiber Composite
Frame typeMonocoque
Handlebar constructionTitec Enduro 141
Handlebar extenderOptional
Handlebar stem detailsTitec AL-PG
Headset size1 1/8 (inches) Threadless Aheadset Kontak AL-2

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG70
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 110 (millimeters) Spindle
Shimano BB-UN52
Crankset parts and sizes 22/32/42 Teeth
Shimano Deore LX
Gear shift leversGrip Shift ESP 9.0
Rear gear set 11 - 30 Teeth
8-speed

Diamondback V-6 Team Fork System Data

Derailleur (Front) Bottom Bracket Mount
Shimano Deore LX Top-swing
Derailleur (Rear)Grip Shift ESP 9.0
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeAnswer Manitou SX

Other Specs of Diamondback V-6 Team

Component group setsMountain Mix
Pedals detailsTime ATAC
Rear shock absorber 3.25 (inches) Travel
Stratos Strata Pro
Saddle seat Hollow Chromoly Rails
WTB SST
Seat post extension 27.2 (millimeters) Diameter
Titec Aluminum


Useful links and guides ....