Merlin CRITICAL PATH 1998 VS Eastern Bikes SLASH 5 COIL 2008 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |

Eastern Bikes Slash 5 Coil
General InfosModel | Slash 5 Coil |
Manufacturer | Eastern Bikes |
Year of production | 2008 |
Current price | Check price Here ==> |
Color choice |
-Black |
Sizes |
- Small - medium - large |
Wheels And Breaking System
Bike front tire | Rear: 26 X 2.20 (inches) Kenda K1011 Front: 26 X 2.35 (inches) Kenda K1056 |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Tektro ML-570 Levers Avid BB7 With 7 (inches) Rotor Brakes |
Hubs for disc brakes | Rear: Eastern Sealed Alloy Disc Front: Eastern Sealed 20 (millimeters) Disc |
Rims manufacturer | 32-hole WTB Laser Disc DH |
Spoke nipples type | Brass |
Spoke wheel | 14ga. Straight Gauge Stainless Steel |
Frame and Body Specs
Frame materials | Not Available |
Frame type | TIG-welded |
Handlebar construction | Eastern Butted Chromoly |
Handlebar extender | Optional |
Handlebar stem details | Eastern Choker |
Headset size | 1 1/8" c |
Gearing Specifications
Bicycle chain | SRAM PC-951 |
Bottom bracket shell width | Not Available |
Bottom bracket type | Spanish |
Crankset parts and sizes | Eastern 32t Teeth Eastern Stealth |
Gear shift levers | SRAM SX5 |
Rear gear set | 11 - 28 Teeth 9-speed |
Eastern Bikes Slash 5 Coil Fork System Data
Derailleur (Front) | Chain Retention Device |
Derailleur (Rear) | SRAM SX-7 |
Fork material | Single Crown Magnesium and aluminum |
Fork type | 150 (millimeters) Travel RockShox Domain 302 U-Turn |
Other Specs of Eastern Bikes Slash 5 Coil
Component group sets | Mountain Mix |
Pedals details | Eastern Dual-Concave |
Rear shock absorber | 5 (inches) Travel RockShox Vivid 4.1 |
Saddle seat | Eastern Pinner |
Seat post extension | Eastern Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Eastern Bikes Slash 5 Coil manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Eastern Bikes Slash 5 Coil Mountain bike here