Merlin CRITICAL PATH 1998 VS Felt NINE RACE 2011 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Felt NINE RACE
General InfosModel | NINE RACE |
Manufacturer | Felt |
Year of production | 2011 |
Current price | Check price Here ==> |
Color choice |
-Alpine white |
Sizes |
- S (15.5) - M (16.5) - L - XL |
Wheels And Breaking System
Bike front tire | 29 X 2.1 (inches) WTB Prowler |
Bike rear tire | Not Available |
Bike wheel size | 29 (inches) Wheels |
Brakeset type | Hayes Stroker Trail Levers Hayes Stroker Trail Brakes |
Hubs for disc brakes | Rear: Shimano FH-M525 Front: Forged Aluminum |
Rims manufacturer | 32-hole WTB Speed Disc |
Spoke nipples type | Alloy |
Spoke wheel | Stainless Stainless |
Frame and Body Specs
Frame materials | FELT 29er Specific 6061 DB ALU With Hydroformed TT |
Frame type | Aluminum |
Handlebar construction | Felt MTB XC Riser |
Handlebar extender | Optional |
Handlebar stem details | Felt 3D-Forged |
Headset size | 1 1/8 (inches) Integrated |
Gearing Specifications
Bicycle chain | Shimano CN-HG74 |
Bottom bracket shell width | Not Available |
Bottom bracket type | With Crankset |
Crankset parts and sizes | Shimano FC-M552 |
Gear shift levers | Shimano SLX ST-M661 |
Rear gear set | 11 - 36 Teeth 10-speed |
Felt NINE RACE Fork System Data
Derailleur (Front) | Shimano SLX M661 |
Derailleur (Rear) | Shimano Deore XT |
Fork material | Not Available |
Fork type | 100 (millimeters) Travel RockShox Reba RL 29 |
Other Specs of Felt NINE RACE
Component group sets | Shimano Mix |
Pedals details | Not Available |
Rear shock absorber | Not Available |
Saddle seat | Felt Mountain Design |
Seat post extension | Felt 6061 Alloy |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Felt NINE RACE manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Felt NINE RACE Mountain bike here