Merlin CRITICAL PATH 1998 VS Fuji DISCOVERY 2 2004 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
![Fuji Discovery 2 2004 comparison online with competitors](https://yobicycle.com/images/models/Fuji-Discovery-2-2004-specs.jpg)
Fuji Discovery 2
General InfosModel | Discovery 2 |
Manufacturer | Fuji |
Year of production | 2004 |
Current price | Check price Here ==> |
Color choice |
-Blue and Silver |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) - 21 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano ST-EF29 Levers ProMax Linear-pull Brakes |
Hubs for disc brakes | Q and R Rear: Shimano RM-40 Front: Aluminum |
Rims manufacturer | 36-hole Araya VP-20 |
Spoke nipples type | Brass Nipples |
Spoke wheel | 14ga. Straight Gauge Stainless Steel |
Frame and Body Specs
Frame materials | Altair 1 Aluminum |
Frame type | TIG-welded |
Handlebar construction | Rise Aluminum |
Handlebar extender | Optional |
Handlebar stem details | Aluminum Threadless |
Headset size | 1 1/8 (inches) Threadless Ritchey Logic |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) KMC Z72 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 122.5 (millimeters) Spindle Sealed |
Crankset parts and sizes | 24/34/42 Teeth Suntour XCC-150 |
Gear shift levers | Shimano ST-EF29 EZ Fire STI |
Rear gear set | 11 - 32 Teeth 8-speed |
Fuji Discovery 2 Fork System Data
Derailleur (Front) | Top-pull and clamp-on 31.8 (millimeters) SR TP-17 |
Derailleur (Rear) | Shimano Acera |
Fork material | Single Crown Aluminum and magnesium |
Fork type | SR Suntour XC60 |
Other Specs of Fuji Discovery 2
Component group sets | Mountain Mix |
Pedals details | Wellgo Resin |
Rear shock absorber | 3.3 (inches) Travel ToughShock MA |
Saddle seat | Fuji Comp MTB |
Seat post extension | 29.8 (millimeters) Diameter Aluminum Micro-adjust |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Fuji Discovery 2 manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Fuji Discovery 2 Mountain bike here