Merlin CRITICAL PATH 1998 VS Fuji DSR 1.0 2010 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
![Fuji DSR 1.0 2010 comparison online with competitors](https://yobicycle.com/images/models/Fuji-DSR-1.0-2010-specs.jpg)
Fuji DSR 1.0
General InfosModel | DSR 1.0 |
Manufacturer | Fuji |
Year of production | 2010 |
Current price | Check price Here ==> |
Color choice |
-Red and Black |
Sizes |
- XS - S - M - L |
Wheels And Breaking System
Bike front tire | 26 X 2.25 (inches) Schwalbe Racing Ralph |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Hydraulic Levers Shimano XTR Disc With 180 (millimeters) Rotor Front and Shimano XTR Disc With 160 (millimeters) Rotor Rear Brakes |
Hubs for disc brakes | Reynolds MTN C |
Rims manufacturer | 24-hole Reynolds MTN C |
Spoke nipples type | Not Available |
Spoke wheel | 2.0/1.5/2.0 Double-butted DT Swiss Stainless Steel |
Frame and Body Specs
Frame materials | Fuji C-7 High Modulus Carbon |
Frame type | Monocoque |
Handlebar construction | Ritchey WCS Carbon Lo Rizer |
Handlebar extender | Optional |
Handlebar stem details | Ritchey WCS Carbon 4-Axis |
Headset size | 1 1/8 (inches) - 1 1/2 (inches) Integrated Fsa No. 42 |
Gearing Specifications
Bicycle chain | Shimano HG-73 |
Bottom bracket shell width | Not Available |
Bottom bracket type | Shimano External Bearing |
Crankset parts and sizes | 22/32/44 Teeth Shimano XTR HollowTech II |
Gear shift levers | Shimano XTR |
Rear gear set | 11 - 34 Teeth 9-speed |
Fuji DSR 1.0 Fork System Data
Derailleur (Front) | Clamp On 34.9 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR Shadow |
Fork material | Single Crown |
Fork type | 100 (millimeters) Travel FOX F-32RLC FIT With Remote Lock Out |
Other Specs of Fuji DSR 1.0
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 100 (millimeters) Travel FOX RP-32 With Pro-pedal |
Saddle seat | Ritchey WCS Stream With Carbon Rails |
Seat post extension | Integrated |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Fuji DSR 1.0 manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Fuji DSR 1.0 Mountain bike here