Merlin CRITICAL PATH 1998 VS Fuji THRILL LT 1.0 2010 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Fuji Thrill LT 1.0 2010 comparison online with competitors

Fuji Thrill LT 1.0

General Infos
Model Thrill LT 1.0
Manufacturer Fuji
Year of production 2010
Current price Check price Here ==>   
Color choice -Matte Bronze
Sizes - XS
- S
- M
- L

Wheels And Breaking System

Bike front tire Rear: 26 X 2.35 Schwalbe Albert Performance
Front: 26 X 2.35 (inches) Schwalbe Albert Performance
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano SLX Hydraulic Levers
Shimano SLX Disc With 203 (millimeters) Rotor Brakes
Hubs for disc brakes Rear: Shimano SLX Centerlock Disc
Front: Shimano SLX 20 (millimeters) Thru-axle Centerlock Disc
Rims manufacturer 32-hole
WTB SpeedDisc
Spoke nipples typeNot Available
Spoke wheel 14ga. Straight Gauge
Stainless Steel

Frame and Body Specs

Frame materialsFuji Altair 2 Aluminum
Frame typeTIG-welded
Handlebar constructionTruvativ XR Riser 20 (millimeters)
Handlebar extenderOptional
Handlebar stem detailsTruVativ XR
Headset size1 1/8 (inches) Integrated Ritchey Logic Zero Comp

Gearing Specifications

Bicycle chainKMC HG-73
Bottom bracket shell widthNot Available
Bottom bracket typeShimano External Bearing
Crankset parts and sizes 22/36 Teeth
Shimano SLX With Bashguard
Gear shift leversShimano SLX RapidFire
Rear gear set 11 - 34 Teeth
9-speed

Fuji Thrill LT 1.0 Fork System Data

Derailleur (Front) Clamp On 34.9 (millimeters)
Shimano SLX
Derailleur (Rear)Shimano SLX
Fork materialSingle Crown
Fork type 160 (millimeters) Travel
Rock Shox Domain 302

Other Specs of Fuji Thrill LT 1.0

Component group setsShimano SLX
Pedals detailsOptional
Rear shock absorber 150 (millimeters) Travel
RockShox Ario 2.2 With Motion Control
Saddle seatWTB Pure V Race FR
Seat post extension 350 (millimeters)
TruVativ XR 2-Bolt


Useful links and guides ....