Merlin CRITICAL PATH 1998 VS Gary Fisher HIFI PRO 29 2010 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Gary Fisher HiFi Pro 29 2010 comparison online with competitors

Gary Fisher HiFi Pro 29

General Infos
Model HiFi Pro 29
Manufacturer Gary Fisher
Year of production 2010
Current price Check price Here ==>   
Color choice -Matte White and Matte Black
Sizes - SM (15.5) (inches)
- MD (17.5) (inches)
- LG (19) (inches)
- XL (inches)
- XXL (inches)

Wheels And Breaking System

Bike front tire 28-hole
Rhythm Elite TLR Disc 29
Bike rear tire29 X 1.90 (inches) Bontrager XDX
Bike wheel sizeSRAM PG-970
Brakeset type 11 - 34 Teeth
9-speed
Hubs for disc brakesBontrager Race Lite
Rims manufacturerNot Available
Spoke nipples type14/15ga.
Spoke wheel 100 (millimeters) Travel
7.25 (inches) X 1.75 (inches)
Fox Float RP23 XV

Frame and Body Specs

Frame materialsTIG-welded
Frame typeNot Available
Handlebar construction E2
1 1/8 (inches) - 1 1/2 (inches) Semi- Integrated FSA 57 Orbits
Handlebar extender 31.8 (millimeters)
690 (millimeters) X 17d
Bontrager Race Lite Bigger Sweep
Handlebar stem detailsOptional
Headset sizeOptional

Gearing Specifications

Bicycle chainShimano Press Fit
Bottom bracket shell width6011 Hydroformed Butted Aluminum
Bottom bracket typeNot Available
Crankset parts and sizesNot Available
Gear shift leversMountain Mix
Rear gear setNot Available

Gary Fisher HiFi Pro 29 Fork System Data

Derailleur (Front)SRAM X.9
Derailleur (Rear) Direct Mount
Shimano XT
Fork material 100 (millimeters) Travel
Fox F100 FIT RL 29
Fork type 22/32/44 Teeth
Shimano XT FC-M770

Other Specs of Gary Fisher HiFi Pro 29

Component group setsNot Available
Pedals detailsSRAM X.9
Rear shock absorberG2 51 (millimeters) Offset
Saddle seat 7d Rise
Bontrager Race X Lite OS
Seat post extensionBontrager Race Lite With Hollow Cromoly Rails


Useful links and guides ....