Merlin CRITICAL PATH 1998 VS Gary Fisher LEVEL BETTY FH1 1998 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Gary Fisher Level Betty FH1 1998 comparison online with competitors

Gary Fisher Level Betty FH1

General Infos
Model Level Betty FH1
Manufacturer Gary Fisher
Year of production 1998
Current price Check price Here ==>   
Color choice -Lime Green with Eggplant swingarm
Sizes - Large
- medium
- small

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB TyranaRaptor
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes and Avid AD 1.0 Rear Levers
Hayes Hydraulic Disc Brake System and Avid 1D 10 Rear Brakes
Hubs for disc brakes Rear: Shimano STX-RC
Front: Hayes
Rims manufacturer 32-hole
Bontrager
Spoke nipples typeBrass Nipples
Spoke wheel 2.0 (millimeters) Double-butted
DT Stainless Steel

Frame and Body Specs

Frame materialsFisher Genesis Aluminum With Replaceable Derailleur Hanger
Frame typeTIG-welded
Handlebar constructionBontrager Crow
Handlebar extenderOptional
Handlebar stem detailsBontrager Aluminum
Headset size1 1/8 (inches) Threadless Aheadset Kontak ST-2

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Sachs PC-41
Bottom bracket shell width73 (millimeters) English
Bottom bracket type 113 (millimeters) Spindle
Shimano BB-UN52
Crankset parts and sizes 20/32/42 Teeth
Sugino Impel 300
Gear shift leversShimano Deore LX RapidFire SL
Rear gear set 11 - 30 Teeth
8-speed

Gary Fisher Level Betty FH1 Fork System Data

Derailleur (Front) Top-pull
Shimano STX Top-swing
Derailleur (Rear)Shimano Deore XT SGS
Fork material Double Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Judy XL

Other Specs of Gary Fisher Level Betty FH1

Component group setsMountain Mix
Pedals detailsICON Clipless
Rear shock absorber 5.3 (inches) Travel
Rock Shox Super Deluxe With Handlebar-mounted Damping Adjuster
Saddle seatTitec Berserker
Seat post extension 27.2 (millimeters) Diameter
Aluminum Micro-adjust


Useful links and guides ....