Merlin CRITICAL PATH 1998 VS Gary Fisher SUGAR 2+ DISC 2002 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Gary Fisher Sugar 2+ Disc 2002 comparison online with competitors

Gary Fisher Sugar 2+ Disc

General Infos
Model Sugar 2+ Disc
Manufacturer Gary Fisher
Year of production 2002
Current price Check price Here ==>   
Color choice -Green
Sizes - Small
- Medium
- Large
- Extra large

Wheels And Breaking System

Bike front tire26 X 2.25 (inches) IRC Back Country
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes HFX Magnesium Hydraulic Levers
Hayes HFX Magnesium Hydraulic Brakes
Hubs for disc brakesBontrager Race Disc
Rims manufacturer 28-hole
Bontrager Race Disc
Spoke nipples typeAluminum Nipples
Spoke wheelStainless Steel

Frame and Body Specs

Frame materials6061 T6 Aluminum
Frame typeTIG-welded
Handlebar constructionBontrager Crowbar Race
Handlebar extenderOptional
Handlebar stem detailsBontrager Race
Headset size1 1/8 (inches) Threadless Dia-Compe SAS

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG72
Bottom bracket shell widthNot Available
Bottom bracket typeBontrager Race Isis
Crankset parts and sizes 22/32/44 Teeth
Bontrager Race
Gear shift leversShimano Deore XT RapidFire SL
Rear gear set 11 - 32 Teeth
9-speed

Gary Fisher Sugar 2+ Disc Fork System Data

Derailleur (Front) Clamp-on
Shimano Deore XT Bottom-swing
Derailleur (Rear)Shimano XTR SGS
Fork material Single Triple-clamp Crown
Aluminum
Fork type 3.15 (inches)-4.0 (inches) Adjustable Travel
Rock Shox Psylo SL

Other Specs of Gary Fisher Sugar 2+ Disc

Component group setsMountain Mix
Pedals detailsTime ATAC
Rear shock absorber 2.8 (inches) Travel
Cane Creek AD-12
Saddle seatWTB Laser V Race
Seat post extensionBontrager Race


Useful links and guides ....